Finishes
A. Flooring
1. PVC free maple planks was proposed in lieu of resilient sheet flooring (50% DD).
a. Users and the facility concerned with sealing conditions at seams.
b. RR will provide product information of PVC free sheet goods installed in B25.
c. BDC is to review information from RR and propose an alternate PVC free sheet product. All seams are to be welded.
2. Epoxy flooring in BSL-3
a. Smoother texture with slip-resistance is preferred.
b. BDC to research laboratory standards.
B. Wall Accent Paint
1. Users prefer cooler and softer colors.
C. Chairs
1. Task chair
a. Herman Miller Mirra 2 task chair
2. Conference room Chairs
a. KJ informed that Herman Miller Caper chair is a Building 25 standard in conference rooms. This
…show more content…
Final selection is to be coordinated with the facility standard. For 100% DD submittal, it was discussed to proceed with the following until the final selections.
i. Painted HM entry doors ii. Painted HM doors in BSL-2 and BSL-3 (except sliding doors) iii. Wood veneer doors in Office area.
f. RR is to provide the facility door standards.
E. Countertop
1. Pivot Interior is to provide the followings.
a. Corian countertop at sink locations. Users indicated this is acceptable (no concerns with staining).
b. Epoxy countertop at the staining sink (epoxy).
c. Chemsurf countertop at other work surfaces in BSL-2 and BSL-3.
i. The lab planner commented on 50% DD that epoxy or stainless steel countertop is recommended in BSL-3 area. It concur with NIH guidelines (epoxy countertop). ii. Users and the facility confirmed their preference on epoxy countertop in BSL-3 areas.
F. Window shades
1. The proposed mechoshade with 3% openness is acceptable.
2. RR noted that window shade in glazing are not
…show more content…
Workstations in Open Office Area
1. JC indicated that lower height furniture system was previously discussed in the open office area. This is to open up the space for visibility.
a. No upper storage is preferred at (6) workstations at the center of the room.
b. Mobile under counter storage unit is desired at workstations without upper storage.
2. Preference to have lockers (2-tier) was discussed.
3. BDC is to propose (3) options.
a. Adjust length of workstations to have u/c storage units with the current configuration.
b. Provide 18 lockers in toilet vestibule.
c. Turn center workstations 90 degree to maximize the standing meeting space.
Lighting Fixtures
A. LED Lighting fixtures
1. RR agreed with LED lighting selections because it lasts longer.
2. Pendant lighting fixture
1. Users and the facility concern with collecting dust.
2. RR is to review pendant lighting fixtures with EVS.
Follow Up Items
A. Finish selections
1. MT proposed to provide a couple more color schemes and present them to the Public Health Lab staff (Lunch Presentation) after 100% DD submittal.
a. Provide purple and green color scheme.
2. BDC will proceed with 100% DD based on today’s discussion and
All three of the policies are in some way a little bit different than the current system in place in New York. Delaware uses a three-tier system that allows the state and local government to share the responsibility of making decisions regarding distribution. Tier 1 provides funding for the cost for such things as teachers salaries and their benefits. In addition, this Tier determines the amount of money needed per pupil, meaning that the number of students in the district determines the amount of funds that a district received. Tier II: this is the amount of money given to the district by the state to cover such things as schools supplies, building maintenance and utilities. Tier III: this is the fund, provided to the districts base on their pupil number, and this helps to equalize things between poor and wealthy districts.
ApriLoC should be able to operate 24/7 without any disruptions. The system should also have enough secondary memory to store all user information and device information and log information especially as the system grow. ApriLoC should also perform various tasks efficiently such us log in, changing passwords etc. Additionally, the system should ensure top notch security in the organization using the product.
When NetQ sets a goal, we strive with putting forth all our internal and external resources to accomplish that goal. For example, when it comes to security, we use a secure server login. That means we make use of a computer system that has been designed or dedicated to secure online commercial transactions when using a network. We provide customers with some of the best security in the industry.
We tested the system interactiveness by checking if anyone can be a floor chair if the chat and whiteboard are still functioning. Obviously, it works because the data was synchronized. Also, it is incomparable with H.323 because it did not implement this feature. We analyzed the components that were synchronized.
From my longhand calculation sheet, my protein RDA goal based on 0.8 g protein/kg body weight was 43.9 g/day, which is slightly lower than my 3-day average intake which was 45.08 g. According to these values, I am not concerned about my protein intake value because protein is not a major source of energy and it does not store in the body. As a result, for me, maintaining the similar amount of protein intake is a better choice. If the protein are over consumed, it might leads to the deficiency of nutrient-dense foods intake and increase potential risks of kidney disease and colon cancer (Hammond, 2016b). On the other hand, if we consume too less protein, the risks of malnutrition and life-threatened diseases such
Temperature & Humidity Control – The servers currently sit underneath large air conditioning vents. Condensation can form inside these vents and cause equipment shortages. The temperature of the room in which the servers sit is currently suitable for electronics. If cooling is an issue at other times of the year, then the following suggestions will help to keep the equipment cooler:
There are three questions needed to be answered to strengthen the statement from the memorandum.
The security concerns for IaaS and PaaS models are described collectively because of their reliance over each other. The attacks on these two layers are of three types: attacks on the cloud services, attacks on virtualization and attacks on utility computing. Hardware virtualization, software virtualization, cloud software, utilitycomputing and Service Level Agreement (SLA) are considered some of the common security concerns for IaaS and PaaS.
In this chapter, the qualitative interview data is analyzed to reveal findings to show gaps in research.
DSP Starter Kit (DSK) package is well equipped with TMS320C6713 DSP Devel- opment Board with 512K Flash and 16MB SDRAM along with C6713 DSK Code Composer Studio. This kit uses USB communications which connect DSK board to a PC for plug-and-play functionality. Furthermore, this DSK package includes a 5V universal power supply for the DSK board.
3.8) Scheduler: Scheduler in an operating system selects the next process to be admitted into the system and next process to run. The three schedulers and their differences are as follows:-
Richard, reading your post and the point you made about good judgment reminded me of the parable of the talents in the bible Matthew 25:14-30, you know the store. One was given five talents, another was given two talent, and the third was given one talent. The man with five doubled his, and made ten, the man with two doubles his as well, but the third guy buried his and did nothing with his. The master was displeased with the third man because he did nothing with what he was given. The type of people, I want on my team are like the first two, given little direction and get a huge return, in this situation, the third guy needed more direction and supervision in order to do what is right, and that not the type I would want on my
While working with VPC we can create a VPC with IPv4 CIDR block, a subnet with an IPv4 CIDR block, and launch a public-facing instance into the subnet. The instance will be able to communicate with the Internet, and it’s permissible to access the instance from the local computer using SSH when its Linux based or Remote Desktop when it's a Windows based. The following scenario will enable to create a public-facing web server; for example, to host a blog.
These requirements fall under the "Housekeeping" section of OSHA's general requirements. Other significant considerations include air quality, lighting considerations, and noise exposure. Conscientious employers address air quality concerns by ensuring that routine maintenance for heating, ventilation, and air conditioning units occurs at regularly scheduled intervals, and that filters or pads are replaced according to manufacturer's specifications. Inadequate or inappropriate lighting has been recently associated with migraine and vision disorders in some individuals (Berkley, 2006). Employers must ensure that the lighting used in work environments meets OSHA standards of brightness, spectrum, and stability (non-flickering). Excessive noise in an office environment can be generated by a number of factors including copy machines, computer servers, printers, and mail processing machines. Business leaders must ensure that the noise produced by this equipment is within acceptable limitations or that employees are provided with protective equipment.
The renovation of the flooring in MLH-120 was to update classrooms and labs to current standards because current classrooms and labs simply don't meet the new requirements of the ADA (Americans with Disabilities Act). Data was collected through different means of measurement of the classroom, tables, bolts and nuts. Tools that were used in the data collection was a micrometer, vernier calipers, meter stick, and a fiberglass tape measure. Measurements were conducted three times by team members, which reduced the margin for error in data collection. These tools were used to evaluate and to give concrete data and measurements of the classroom, tables, bolts and nuts.