preview

Sample Resume : Quality Management

Better Essays

Quality Management Case Study • describe the main interdependencies between processes in the project or manufacturing system; It is necessary to consider interdependencies when planning and implementing the project to effectively manage the time and resources. A common approach to this is utilising a technique known as process management, whereby quality management processes are put in place to ensure that targets identified in the quality planning phase are adhered to by implementing various quality control techniques. The major processes involved in our chosen project would be identifying quality standards, measuring the quality achieved against the pre-established standards, and maintaining or improving the quality output within the …show more content…

It is also important to pass information to and from the design phase to the supply chain, so the required materials are known. Supply The supply is reliant on the design and influences the production. If it is possible to source materials locally which comply with the standards it makes financial sense to use them, as opposed to having to transport them a larger distance. It stands to reason that because of these variable factors the assembly is going to be greatly influenced by the supply. Assembly The assembly phase is the culmination of all the research conducted to produce a design based on the availability of supplies. It should also take into account the life cycle of the plant and how it is to be maintained. This can be done by producing a layout that facilitates quick response times to potential emergencies. Inspection This phase of quality control is what will ensure that quality standards are maintained. By collecting and analysing data, different aspects of the project such as the power output can be fed back to the research and design teams to improve the quality of the service through observation. Distribution Once the project is operational, the electricity needs to be distributed to the grid and onto the customers such as businesses, or the general population. This is dependent on all the previous processes, as the power plant could not reach a functional state without everything before having been completed. • explain what key data needs to

Get Access