3. Suppose you are to measure the BOD removal rate for a primary wastewater treatment plant. You take 2 samples of raw sewage on its way into the plant and two samples of the effluent leaving the plant. Standard 5-day BOD tests are run on the four samples, with no seeding producing the following data: Sample DOi (mg/L) DOf (mg/L) TEP Source Dilution 1 Raw 1:30 9.0 2.2 2 Raw 1:20 9.0 3 Treated 1:15 8.5 1.5 4 Treated ? 9.0 1 a. Find the BOD5 for the raw and treated sewage, and the percent removal of BOD in the treatment plant. b. Find the DO that would be expected in sample 2 at the end of the test. c. What would be the maximum volume of treated sewage for sample 4 that could be put into the 300 ml BOD bottle and still have the DO after 5 days remain above zero?

Principles of Modern Chemistry
8th Edition
ISBN:9781305079113
Author:David W. Oxtoby, H. Pat Gillis, Laurie J. Butler
Publisher:David W. Oxtoby, H. Pat Gillis, Laurie J. Butler
Chapter17: Electrochemistry
Section: Chapter Questions
Problem 80AP
icon
Related questions
Question
3. Suppose you are to measure the BOD removal rate for a primary wastewater treatment plant.
You take 2 samples of raw sewage on its way into the plant and two samples of the effluent
leaving the plant. Standard 5-day BOD tests are run on the four samples, with no seeding
producing the following data:
Sample
Dilution
Doi (mg/L)
DOf (mg/L)
Source
1
Raw
1:30
9.0
2.2
2
Raw
1:20
9.0
?
3
Treated
1:15
8.5
1.5
4
Treated
?
9.0
1
a. Find the BOD5 for the raw and treated sewage, and the percent removal of BOD in the
treatment plant.
b. Find the DO that would be expected in sample 2 at the end of the test.
c. What would be the maximum volume of treated sewage for sample 4 that could be put into
the 300 mL BOD bottle and still have the DO after 5 days remain above zero?
Transcribed Image Text:3. Suppose you are to measure the BOD removal rate for a primary wastewater treatment plant. You take 2 samples of raw sewage on its way into the plant and two samples of the effluent leaving the plant. Standard 5-day BOD tests are run on the four samples, with no seeding producing the following data: Sample Dilution Doi (mg/L) DOf (mg/L) Source 1 Raw 1:30 9.0 2.2 2 Raw 1:20 9.0 ? 3 Treated 1:15 8.5 1.5 4 Treated ? 9.0 1 a. Find the BOD5 for the raw and treated sewage, and the percent removal of BOD in the treatment plant. b. Find the DO that would be expected in sample 2 at the end of the test. c. What would be the maximum volume of treated sewage for sample 4 that could be put into the 300 mL BOD bottle and still have the DO after 5 days remain above zero?
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 3 images

Blurred answer
Knowledge Booster
Phase Diagrams
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, chemistry and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Principles of Modern Chemistry
Principles of Modern Chemistry
Chemistry
ISBN:
9781305079113
Author:
David W. Oxtoby, H. Pat Gillis, Laurie J. Butler
Publisher:
Cengage Learning