5. Make a check sheet and then a Pareto diagram for the following car repair shop data: Ticket No. Work Ticket No. Work Ticket No. Work Tires 11 Brakes 21 Lube & oil Lube & oil 12 Lube & oil 22 Brakes Tires 13 Battery 23 Transmission 14 Lube & oil 24 Brakes Battery 15 Lube & oil 25 Lube & oil Lube & oil 16 Tires 26 Battery Lube & oil 27 Lube & oil 17 Lube & oil Lube & oil Battery 18 Brakes 28 8. Brakes 29 Brakes 19 Tires Lube & oil 30 Tires 20 Brakes Tires 10
Q: A comapny producing electronic equipment purchase batterys at $ 31.5 per unit. The annual requiremen...
A: Annual demand, d = 5501 units Ordering cost, o= $203 Holding cost, h= $5 per unit Lead time, L= 6 da...
Q: Question 2: Consider the following model: Minimize Z = 3x + 2x2, subject to 2x, + x z 10 -3x1 + 2x2 ...
A: a.
Q: Develope a productivity measure for a product that utilizes labor machine time, raw materials and pu...
A: Details given: Units produced = 10,000 Labour hours used = 400 Selling price = $ 11/unit labor rate...
Q: The Green Cab Company has a taxi waiting at each of four cabstands in Evanston, Illinois. Four custo...
A: Given Information Cab site A B C D Stand 1 7 3 4 8 Stand 2 5 4 6 5 Stand 3 6 7 9 6 Stan...
Q: What is Business Forecasting?
A: Business forcasting refers to the process of thinking in advance about the growth and strategies of ...
Q: Name and describe each of the priority sequencing rules
A: Priority Rules give procedures for the sequence by which jobs need to be worked. In utilizing these ...
Q: Develop a p-chart for 95 percent confidence (1.96 standard deviation). Based on the plotted data poi...
A: Here, a total of 10 samples are taken, for each sample, the sample size is 15, for each sample, we h...
Q: g) Suppose that the profit contribution of component 3 decrease by $2.00 . Would the optimal solutio...
A:
Q: What role does a security risk assessment have in the organisation?
A: A Security Risk Assessment often called SRA can be stated as the evaluation or assessment that gener...
Q: Problem 4 A. Complete the following Table for Product A MPS Record for Product A Demand time fence: ...
A: Given data is
Q: To complete the problem the following is necessary. 1) project network diagram (AON), 2) table that ...
A: Since you have posted a question with multiple sub-parts, we will solve the first three subparts for...
Q: . Explain the importance of resource planning in project scheduling.
A: A resource plan is designed during the planning phase of any project. It is made by the person in c...
Q: Utikasn Ltd. purchase glass bowls for € 2.5 per unit or they can manufacture it with fixed cost of €...
A: Given: Per unit price = € 2.5 Fixed cost = € 69,000 Variable cost = € 1.5 Demand quantity = 1,01,00...
Q: nd throughout a project. 2. For each project phase identified in 1(a) above, identify and describe ...
A: The project life cycle contains the processes necessary for project managers to effectively manage a...
Q: The EMV for option a is $
A: Expected monitory value indicating the value expecting from each decision while considering the prob...
Q: Evaluate Golden Valley Food’s present situation. What would you advise Neal Middleton to do not impr...
A: A Small Introduction about Production Management Production management is a course of arranging, ...
Q: ch, 1. Prepare a flowchart on preparing You need to follow the correct flow chart symbol. meal, you ...
A: COOKING AN EGG: 1. If Scrambled, then egg is cracked egg is broken with mike and butter ...
Q: Tuff-Rider, Inc., manufactures touring bikes and mountain bikes in a variety of frame sizes, colors...
A: Given data For touring Demand forecast (D) = 4000 units per year Lot size (Q) = 100 units Standar...
Q: Lifang Wu owns an automated machine shop that makes precision auto parts. He has just compiled an in...
A: given,
Q: b) As a Project Engineer, cost control is one of the areas that is pertinent to project budget. When...
A: Practically every one of the projects should be directed right all through to get the required and a...
Q: Develop a BCG matrix for the American University of Central Asia.
A: Sustainable upgradation of business comes accross number of difficulties due to the global economic ...
Q: What are the problems faced by the avg production system in a developing country and what methods ar...
A: The major issue which the production system of a developing country faces are the efforts of the gov...
Q: describing a Limited Liability Company (LLC) business that would created. Indicate a specific provis...
A: A limited liability company (LLC) is a business entity for private companies in the United States, w...
Q: bly process cha
A: Flow Process Chart: In a flow process chart, all of the activities and events under consideration ar...
Q: M. de Koster, of Rene Enterprises, has the master production plan shown here: ...
A: Given- Production plan- Setup cost (S) = $200Holding cost (H) = $10 per weekStockout cost = $10 per...
Q: “Hawthorne effect is defined as increasing productivity by paying more attention to workers.” This s...
A: The Hawthorne effect is a sort of reactivity where people alter an aspect of their conduct in light ...
Q: b) - Draw the Activity-on-Node (AON) diagram using the following representation for every node: Acti...
A: Activity-on-node is a project management term that directs to a precedence diagramming technique tha...
Q: A comapny producing electronic equipment purchase batterys at $ 31.5 per unit. The annual requiremen...
A: To be determined: Economic order quantity and the reorder point of the company Details given: Per ...
Q: Describe what is meant by " loading" work centers. What arethe two ways work centers can be loaded? ...
A: Work centers are described as an organization where manufacturing activities are carried out, It is ...
Q: What is input-output control?
A: Inputs of the system or framework can be stated as the approach in which the data, energy, or inform...
Q: e activity times after crashing to show the resulting schedule. (
A: Project crashing indicating the process of reducing the total project completion time using addition...
Q: ) List and explain the phases that mark the life of a project. 2) For each project phase identified...
A: The phases in project life cycle are, 1. Initiation 2. Planning 3. Monitoring, Execution and control...
Q: How many units are needed to break even if eaxh completed unit has a value of $100?
A: Break even refers to the level of production at which the revenue of a product is equal to the cost ...
Q: Malburn Construction Ltd. Manufactures and distributes window frames. The company uses 600,000 metal...
A: Note: - Since we can answer only up to three subparts we will answer first three subparts(1, 2, and ...
Q: What is the total cost of reducing this project by two weeks?
A: Project crashing will helps to reduce the total duration by additional cost and efforts. In each of ...
Q: Riex Blocks – “Hastang gahi a” specialized in the manufacturing of high-rise CHB (concrete hollow bl...
A: Economic order quantity is the optimal order quantity that any business should purchase so that the ...
Q: A(n) ___ MRP system provides information to the capacity plan, to the master production schedule, an...
A: Material requirements planning often called MRP system can be stated as the inventory management sys...
Q: Describe the Importnance of liter review while doing Resersch and explain how remote working is affe...
A: A literature review is a review - or, all the more precisely, a study - including academic material,...
Q: Companies can harness a competitive advantage at any one of the five activities in the value chain. ...
A: Due to the continuous increase of competition for unbeatable prices, exceptional products, and custo...
Q: At sejahtera.com, a large retailer of popular books, demand is constant at 32,000 books per year. Th...
A: Here, given data annual demand=32000 The cost of placing the order=10 The annual cost of holding =4 ...
Q: 55. The mail order firm of L. L. Pea receives an averageof 200 calls per hour, where times between c...
A: Given data is as follows: The arrival time is 200/hr. The service rate per hour is 20/hr. The wage r...
Q: please develop a space matrix for Macdonalds in space matrix format.
A: INTRODUCTION- McDonald's is perhaps the biggest organization that has some expertise in inexpensive ...
Q: or the management of __R___
A: Batch size is the number of items created in a manufacturing run. When there is a substantial setup ...
Q: Bradley Solutions and Alexander Limited are two well-established suppliers of inexpensive tools. Wee...
A: a. using Alexander and a shipping quantity of 10000 units is least cost alternative, with annual tot...
Q: Management should think about the trade-offs between storing products in more places in different te...
A: A Small Introduction about Shipping Management Transport management is a significant piece of sea...
Q: An automobile dealer expects to sell 729 cars a year. The cars cost $12,000 plus a fixed charge of $...
A: Here, given annual demand =729 cars, this number of cars are expected to be sold. The delivery charg...
Q: ffing related to each stage of the project life cycle?
A: Phases may be used by project managers or the organization as a way to better manage projects and ke...
Q: what is a turnkey contract what are advantage and disadvantages
A: Turnkey contracts are the type of contracts in which a contractor promises to build a project which ...
Q: 44. US Airlines receives an average of 500 calls per hourfrom customers who want to make reservation...
A: The following information is provided: The arrival rate is 500/hr The service rate is 20/hr Wage rat...
Q: Discuss how you would manage a poor forecast.
A: A poor forecast means that, as a result of this forecast, there has been an imbalance between demand...
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 13 images
- [The following information applies to the questions displayed below.] The following are the car repair shop data: TETE Ticket No. Work Ticket No. Work Ticket No. Work 1 Lube & oil 11 Battery 21 Battery Tires 2 Lube & oil 12 Tires 22 3 Brakes 13 Brakes 23 Brakes 4 Lube & oil 14 Transmission 24 Transmission Lube & oil 15 Brakes 25 Brakes Tires 16 Battery 26 Lube & oil 7 Tires 17 Brakes 27 Lube & oil 8. Brakes 18 Tires 28 Lube & oil 9. Brakes 19 Tires 29 Tires 10 Lube & oil 20 Lube & oil 30 Lube & oil! Required information [The following information applies to the questions displayed below.] The following are the car repair shop data: Ticket No. 1 Work Brakes Ticket No. 11 Work Lube & oil Ticket No. 21 Work Transmission 2 Brakes 12 Battery 22 Lube & oil 3 Tires 13 Tires 23 Tires 4 Brakes 14 Lube & oil 24 Lube & oil 5 Lube & oil 15 Brakes 25 Brakes 6 Lube & oil 16 Tires 26 Brakes 7 Battery 17 Lube & oil 27 Brakes 8 Lube & oil 18 Lube & oil 28 Lube & oil 9 Brakes 19 Brakes 29 Tires 10 Lube & oil 20 Tires 30 Battery Click here for the Excel Data File a. Prepare a check sheet for the above car repair shop data: Work Type Frequency Brakes Tires Lube & oil Battery Transmission Total 0Month # MachineHours (X) MaintenanceCosts (Y) Jan 3,000 $440 Feb 4,500 $690 Mar 8,000 $510 Apr 7,000 $600 May 6,000 $550 Jun 9,000 $980 Jul 3,500 $840 Aug 5,500 $600 What does the slope represent? the rate at which the X variable changes as a result of the Y variable the rate at which the Y variable changes as a result of the X variable the rate at which the independent variable changes as a result of changes in the dependent variable the rate at which the dependent variable changes as a result of the fixed cost component
- The following are the car repair shop data: Ticket No. Work Ticket No. Work Ticket No. Work 1 Tires 11 Lube & oil 21 Lube & oil 2 Brakes 12 Lube & oil 22 Tires 3 Tires 13 Tires 23 Lube & oil 4 Brakes 14 Brakes 24 Lube & oil 5 Tires 15 Transmission 25 Lube & oil 6 Lube & oil 16 Battery 26 Tires 7 Brakes 17 Lube & oil 27 Battery 8 Brakes 18 Lube & oil 28 Lube & oil 9 Lube & oil 19 Brakes 29 Brakes 10 Battery 20 Lube & oil 30 Tires Click here for the Excel Data File Problem 9-1 Part a (Algo) a. Prepare a check sheet for the above car repair shop data:Refer to the figure below relating to a commercial printer (customer) and the company that supplies the paper. Technical requirements Importance to customer Customer requirements Paper will not tear 3 A Consistent finish No ink bleed Prints cleanly 1 2 3 7 Paper width 7 Paper thickness ? Roll roundness thickness Paper width Paper Roll roundness Coating thickness Tensile strength Paper color ? Coating thickness ? Tensile strength 7 Paper color O Customer Requirements Paper doesn't wrinkle Prints clearly Easy to use a. What technical requirements have the highest impact on the customer requirement that the paper not tear? (You may select more than one answer. Click the box with a check mark for the correct answer and click to empty the box for the wrong answer.) J O Type of Paper b. The following table presents technical requirements and customer requirements for the output of a laser printer. Determine which single technical requirement likely has the greatest Impact on each individual…Define the term Plan-Do-Check-Act?
- Hotel ComplaintsA luxury hotel has been receiving a lot of complaints from guests recently. The manager worries that if these complaints continue, the hotel will start to lose clients. Therefore, you have been hired as a consultant to correct the problem(s). A list of the major complaints by week for the last month is as follows: Complaint Number of Occurrences Week 1Error on bill 10Room not ready at check-in 8Room service delivery late 3Longline at check-out 10 Week 2Error on bill 12Noise in hallway 2Longline at check-out…4. Manufacturing Cycle Efficiency CFA Company keeps careful track of the time related to orders and their production. During the most recent quarter, the following average times were recorded for each unit or order: Inspection time Process time Queue time Move time Wait time 2 days 4 days 6 days 8 days 10 days REQUIRED: A) How long in days is the manufacturing cycle time or throughput time? B) What is the manufacturing cycle efficiency ratio? C) What percentage of the production time is spent on non-value-added activities? D) How long in days is the delivery cycle time?Complete a fish-bone chart explaining how a pizza delivery can arrive late on a Friday or Saturday. I Manpower Not enough training Ingredient shortage Not enough boxes Drivers get lost Material Low pay/ high turnover || Match each number in the chart with corresponding reason. Source of error || ||| IV Methods Turnover Training not sufficient Can't handle large orders Spoiled cheese No GPSs Several couriers are ill Poor dispatch Late weekend pizza delivery
- The Union Manufacturing Company is producing two types of products: A and B. The demand forecasts, batch size, and time standards follow: Demand forecast (units/yr) Product A Product B 1,000 4,000 Batch size (units/batch) Processing time (hr/unit) 20 10 3.2 4.5 Setup time (hr/batch) 10 20 Both products are produced on the same machine, called Mark I. 11) Using Table 4.1, what is the total number of hours required of Mark I equipment for the next year? A) fewer than 29,000 hours B) between 29,000 and 30,000 hours C) between 30,000 and 31,000 hours D) more than 31,000 hoursPls help ASAP. Pls do it again as it is not the same as the previous one. It has a different equationB. Product Yield. Record the following data and compute for the product yield. Weight of meat before processing 1.00 kg Weight of finished product (tocino) 1.25 kg Product Yield