A 132 Kv, 50 Hz, 3-phase tensmission line delivers loaed of 5omw at 08 lagging Pf. 9, the transmission line have: A-0.095 LU B-6 L78 190 C-0. ool5 Using Nominal T to Calculade: regulation of the line and charging Curcut

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter7: Symmetrical Faults
Section: Chapter Questions
Problem 7.21MCQ
icon
Related questions
icon
Concept explainers
Question
A 132 Kv, 50 Hz, 3-phase tensmission line
delivers a
load of 5omw at 08 lagging Pf.
the transmission line have:
A-D: 0 95 Lu"
190
C-0. Ool5
B-96
using Nominal Tto Calculade:
regulation of the line and charging Curent?
Transcribed Image Text:A 132 Kv, 50 Hz, 3-phase tensmission line delivers a load of 5omw at 08 lagging Pf. the transmission line have: A-D: 0 95 Lu" 190 C-0. Ool5 B-96 using Nominal Tto Calculade: regulation of the line and charging Curent?
Expert Solution
steps

Step by step

Solved in 5 steps

Blurred answer
Knowledge Booster
Transmission line parameter
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning