A generating station has a maximum demand of 25,000 kW. Calculate the cost per unit generatedfrom the following data: Capital cost = P 120M; Annual load factor = 45%; Annual cost of fuel and oil = P6.5M ; Taxes, wagesand salaries etc. = P6M and Interest and depreciation = 13%

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter6: Power Flows
Section: Chapter Questions
Problem BCSQ
icon
Related questions
icon
Concept explainers
Question

A generating station has a maximum demand of 25,000 kW. Calculate the cost per unit generatedfrom the following data:

Capital cost = P 120M; Annual load factor = 45%;

Annual cost of fuel and oil = P6.5M ;

Taxes, wagesand salaries etc. = P6M

and Interest and depreciation = 13%

Expert Solution
steps

Step by step

Solved in 3 steps

Blurred answer
Knowledge Booster
Load flow analysis
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning