A hydro electric power station is used to supplement the unmet constant load demand for 2 hours and 30 minutes during peak periods.it has a reservoir of 0.03km2 area and 2.7 meters depth .The overall water in the reservoir can generate a total energy of 17236kwh at an effective head of 95 metres.after supplying the load.the reservoir depth has decreased by 20%. 6.Determine the overall efficiency of the power station 7.Determine the load consumptio(kWh) 8.Determine the volumetric flow rate(m3/s)

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter2: Fundamentals
Section: Chapter Questions
Problem 2.11P
icon
Related questions
icon
Concept explainers
Question

A hydro electric power station is used to supplement the unmet constant load demand for 2 hours and 30 minutes during peak periods.it has a reservoir of 0.03km2 area and 2.7 meters depth .The overall water in the reservoir can generate a total energy of 17236kwh at an effective head of 95 metres.after supplying the load.the reservoir depth has decreased by 20%.

 

6.Determine the overall efficiency of the power station

7.Determine the load consumptio(kWh)

8.Determine the volumetric flow rate(m3/s)

Expert Solution
steps

Step by step

Solved in 2 steps with 2 images

Blurred answer
Knowledge Booster
Types of Distribution in Power System
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning