An ECM involving the installation of high efficiency light fixtures without changing lighting period. In order to compute savings, the operating hours of the light are estimated. The lighting power draw during the baseline is obtained from the old light fixtures' manufacturing data sheets. On the other hand, the lighting power draw during the reporting period is measured by metering the lighting circuit. Energy savings are calculated by subtracting the post retrofit power draw from baseline power draw and then multiplied by estimated operating hours. Which M&V option best describe these?

Introductory Circuit Analysis (13th Edition)
13th Edition
ISBN:9780133923605
Author:Robert L. Boylestad
Publisher:Robert L. Boylestad
Chapter1: Introduction
Section: Chapter Questions
Problem 1P: Visit your local library (at school or home) and describe the extent to which it provides literature...
icon
Related questions
Question
An ECM involving the installation of high efficiency light fixtures
without changing lighting period. In order to compute savings, the
operating hours of the light are estimated.
The lighting power draw during the baseline is obtained from the
old light fixtures' manufacturing data sheets. On the other hand,
the lighting power draw during the reporting period is measured by
metering the lighting circuit.
Energy savings are calculated by subtracting the post retrofit
power draw from baseline power draw and then multiplied by
estimated operating hours.
Which M&V option best describe these?
Transcribed Image Text:An ECM involving the installation of high efficiency light fixtures without changing lighting period. In order to compute savings, the operating hours of the light are estimated. The lighting power draw during the baseline is obtained from the old light fixtures' manufacturing data sheets. On the other hand, the lighting power draw during the reporting period is measured by metering the lighting circuit. Energy savings are calculated by subtracting the post retrofit power draw from baseline power draw and then multiplied by estimated operating hours. Which M&V option best describe these?
Expert Solution
steps

Step by step

Solved in 3 steps with 1 images

Blurred answer
Knowledge Booster
Single Phase Controlled and Uncontrolled Rectifiers
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Introductory Circuit Analysis (13th Edition)
Introductory Circuit Analysis (13th Edition)
Electrical Engineering
ISBN:
9780133923605
Author:
Robert L. Boylestad
Publisher:
PEARSON
Delmar's Standard Textbook Of Electricity
Delmar's Standard Textbook Of Electricity
Electrical Engineering
ISBN:
9781337900348
Author:
Stephen L. Herman
Publisher:
Cengage Learning
Programmable Logic Controllers
Programmable Logic Controllers
Electrical Engineering
ISBN:
9780073373843
Author:
Frank D. Petruzella
Publisher:
McGraw-Hill Education
Fundamentals of Electric Circuits
Fundamentals of Electric Circuits
Electrical Engineering
ISBN:
9780078028229
Author:
Charles K Alexander, Matthew Sadiku
Publisher:
McGraw-Hill Education
Electric Circuits. (11th Edition)
Electric Circuits. (11th Edition)
Electrical Engineering
ISBN:
9780134746968
Author:
James W. Nilsson, Susan Riedel
Publisher:
PEARSON
Engineering Electromagnetics
Engineering Electromagnetics
Electrical Engineering
ISBN:
9780078028151
Author:
Hayt, William H. (william Hart), Jr, BUCK, John A.
Publisher:
Mcgraw-hill Education,