An industrial load of 5 MW is installed with shunt capacitor of rating 2 MVAR to maintain the power factor at 0.95 lagging. If the capacitor goes out of service what will be the power factor of the industrial load. 0.720 lagging 0.808 lagging 0.902 lagging 0.850 lagging

Power System Analysis and Design (MindTap Course List)
6th Edition
ISBN:9781305632134
Author:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Chapter2: Fundamentals
Section: Chapter Questions
Problem 2.7P: Let a 100V sinusoidal source be connected to a series combination of a 3 resistor, an 8 inductor,...
icon
Related questions
Question
An industrial load of 5 MW is installed with shunt capacitor of rating 2 MVAR to maintain the power factor at 0.95
lagging. If the capacitor goes out of service what will be the power factor of the industrial load. 0.720 lagging 0.808
lagging 0.902 lagging 0.850 lagging
Transcribed Image Text:An industrial load of 5 MW is installed with shunt capacitor of rating 2 MVAR to maintain the power factor at 0.95 lagging. If the capacitor goes out of service what will be the power factor of the industrial load. 0.720 lagging 0.808 lagging 0.902 lagging 0.850 lagging
Expert Solution
steps

Step by step

Solved in 3 steps with 3 images

Blurred answer
Knowledge Booster
P-channel Metal-Oxide Semiconductor (PMOS), N-channel Metal-Oxide Semiconductor (NMOS), and Complementary Metal-Oxide Semiconductor (CMOS)
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, electrical-engineering and related others by exploring similar questions and additional content below.
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Power System Analysis and Design (MindTap Course …
Power System Analysis and Design (MindTap Course …
Electrical Engineering
ISBN:
9781305632134
Author:
J. Duncan Glover, Thomas Overbye, Mulukutla S. Sarma
Publisher:
Cengage Learning