Estimate the cost of a 0.75 million gallon per day (MGD) induced-draft packed tower for air-stripping trihalomethanes from drinking water if the cost for a 2.9-MGD tower is $153,200. The exponent in the cost-capacity equation is 0.47. The cost of a 0.75 million gallon per day induced-draft packed tower is $
Q: Problem #3 – At Freeze Inc. the manufacturing of each air conditioning has a variable cost of $400…
A: Break-even point is the point where the cost of production and revenue of production are equal in an…
Q: A ready-to-drink juice manufacturing Plant had recorded a total annual production of 11,124,095.87 L…
A: Given data is Total annual production in 2019 = 11,124,095.87 L Annual water usage in 2019 = 108,009…
Q: Juicy-Juice Ltd. is planning to increase its juice supply for the fiscal year 2021 – 2022. With the…
A: Find the Decision tree below:
Q: Over the years, BMW has earned an enviable reputation for quality-built cars. To ensure they…
A: S = Number of Super Luxury units sold L = Number of Luxury units sold A = Number of Affordable…
Q: A is an exceptional surgeon working in Hospital K. He decides to decline an offer from a newly set…
A: Research based approach is used to determine strategic resources a firm could exploit to gain the…
Q: Southeastern Airlines's daily flight from Atlanta to Charlotte uses a Boeing 737, with all-coach…
A: Find the Calculation methods below: Per seat contribution = Price - Variable costs Total…
Q: What are some capacity measures and constraints for each of the following? University Hospital…
A: Capacity is computing the quantity of load that an object can hold on a given time. Constraints are…
Q: An interactive television service that costs $10 per month to provide can be sold on the information…
A: The maximum amount that company could spend on annual fixed costs to acquire and maintain the…
Q: Excluding any potential no-show billings, how much extra room revenue will be gained from…
A: Answer is as below:
Q: Cost Estimation; Average Cost Chloe’s Cafe bakes croissants that it sells to local restaurants…
A:
Q: Tim Smunt has been asked to evaluate two machines. After some investigation, he determines that…
A: For Machine A - Cash Flow at Year 0 = -15000 Cash Flow at Year 1 = -2400-4300 = -6700 Cash Flow at…
Q: The Academic Computer Center has five trainers available in its computer labs to provide training…
A: Operational efficiency is described as the organizational ability to focus on the reduction of…
Q: Eric Andrews has been investigating the possibility of starting a service that will partner with…
A: The implementation of strategic tools like the SWOT, BCG and Porter's is done by the companies. This…
Q: Cisco, Inc., has a proposal from the Engineering Planning Division to invest Cisco retained earnings…
A: Given - Initial investment projection is $5,700,000 in year 0, $1,900.000 in year 7, $137.480 in…
Q: Which of the following is a long-term capacity expansion option: Select one: a. Rental or lease of…
A: The long-term capacity expansion involves growing an existing business in terms of capacity, that…
Q: A company has a factory that is designed so that it is most efficient (average unit cost is…
A: Capacity utilisation = Capacity Used/Best Operatiing Level * 100
Q: Janelle Heinke, the owner of Ha’Peppas!, is consider-ing a new oven in which to bake the firm’s…
A: GIven Information: Oven Type A - Capacity = 20 pizzas in an hour Fixed Cost = $ 20,000 Variable…
Q: A product line manufacturing shoes, has five stations in series whose individual capacities per…
A: Station No 1 2 3 4 Individual Capacity 600 650 650 550 The capacity of the system is decided…
Q: Explain and expand these importance of capacity planning. 1. Capacity decisions often involve…
A: Capacity Planning is defined as a process of meeting the changing trends of demand of acompany's…
Q: Identify the process's existing capacity and determining whether the process's present capacity…
A: The capacity of a manufacturing unit can be expressed in terms of the number of quantities…
Q: Case: Cooper's Chocolate Manufacturing Company - Application in Operations Management You were hired…
A: Let M = MelChoc, S = SurgeEn Max Z = 280 M + 225 S subject to 7 M + 26 S <= 190000…
Q: Tri-County G&T sells 150,000 MWh per year of electrical power to Boulder at $75 per MWh, has…
A: Total demand = 1000000 MWh = 1 million MWh Fixed Cost = $82.5 m Variable Cost/MWh = $325 Variable…
Q: The net annual operating cost for a water treatment filtration plant for a semiconductor fabrication…
A: The detailed solution is given in Step 2.
Q: A manufacturer of ballet shoes has determined that its production facility has a design capacity of…
A: Capacity utilization relative to design capacity = (actual output/design capacity)*100=…
Q: Markland Manufacturing intends to increase capacity by overcoming a bottleneck operation by adding…
A:
Q: An auto-parts manufacturer is considering establishing an engineering computing center. This center…
A: Given data Cost = $25000 Service Life = 5 years Salvage Value = 0 Annual operating and maintenance…
Q: The XYZ manufacturing company is considering replacing one of its metal cutting machine which can be…
A: Below is the table we used for the company must use the defender for the next 4 years.
Q: The MFA Co. Ltd. presently moves pallet loads of cans from production to the truck dock for loading.…
A: A pallet's load capacity is the greatest measure of weight that the pallet is intended to convey. It…
Q: A company has a factory that is designed so that it is most efficient (average unit cost is…
A: Capacity utilization rate is the measure of the proportion of economic output actually realized…
Q: The Ace Steel Mill estimates the demand for steel in millions of tons per year as follows:Millions…
A: Given Information: Millions of Tons Probability10…
Q: Any increase in efficiency also increases utilization. Although the upper limit on efficiency is 100…
A: Production efficiency may be a financial term depicting A level during which an economy or substance…
Q: A manager must decide how many machines of a certain type to buy. The machines will be used to…
A: Find the Given details below: Given details: Decision Buy 1 Machine Buy 2 Machines Demand Low…
Q: Explain and expand these importance of capacity planning. 1. Capacity decisions have a real…
A: Capacity is the capability to produce the desired output per unit time by any organization. Capacity…
Q: Management may choose to build up capacity in anticipation of demand or in response to developing…
A: A risk-taking approach is the technique for capacity building ahead of demand. Investment is…
Q: Problems 2 Helen Murvis, hospital administrator for Portland General Hospital, is trying to…
A: A decision table indicates the decision-making reason & the corresponding activities taken in a…
Q: Micromedia offers computer training seminars on a variety of topics. In the seminars each student…
A: X = Number of students who enroll in the seminar Total cost = Fixed cost + Variable cost Variable…
Q: . Suppose a manager is using maximum EMV as a basis for making a capacity decision and, in the…
A: The expected monetary value is part of risk management techniques used by organizations to perform a…
Q: A school district has forecast student enrollment for several years into the future and predicts…
A: When the varsity district realized it had excess capacity in handling students up to…
Q: a. Compute the labor productivity with the old system (in titles / worker hour). b. Compute the…
A: Productivity is the production efficiency of manufacturing products and services using different…
Q: A manager must decide which type of equipment to buy, Type A or Type B. Type A equipment cost…
A: Capacity refers to the total amount of units a firm is producing during a given period of time while…
Q: A real estate agent is considering changing her cell phone plan. There are three plans to…
A: Total minutes for daytime are 120 and evening are 40. Hence total cost for different plans is as…
Q: $1,800. If the firm chooses to refurbish the equipment, materials and labor will be $1.10 per board.…
A: Given - Cost of Refurbish = $800 and Material & labor cost = $1.10 per board Cost of Major…
Q: Cost Allocation Problem The housekeeping services department of Ruger Clinic, amultispecialty…
A: Given:Cost=$100,000 Revenue generated= $5 millionHours of housekeeping= 5000
Q: The warehouse manager wants to gain an understanding of his total costs for the next year.…
A: Given Information: Case 1:- Number of employees = 18 Earning of an employee per hour = $ 18.2 Number…
Q: In a service process such as the checkout counter in a discount store, what is a good target percent…
A: Companies must plan their capacities by considering the relationship between the quality of service…
Q: Southeastern Airlines's daily flight from Atlanta to Charlotte uses a Boeing 737, with all-coach…
A: Total number of seats = 120. Single price approach : The cost of each seat for one way flight =…
Q: In considering a capacity expansion, we have two alternatives. The first alternative is expected to…
A: The determination of the favourable alternative and expected value of the capacity expansion is…
Q: A company has a factory that is designed so that it is most eficient (average unit cost is…
A: Given Actual output in October = 10925 units Maximum output capability = 17250 units
Q: A company has a factory that is designed so that it is most efficient (average unit cost is…
A: Given, Actual output = 15,000 units Maximum possible outputs produced in October = 10,925 units
Estimate the cost of a 0.75 million gallon per day (MGD) induced-draft packed tower for air-stripping trihalomethanes from drinking water if the cost for a 2.9-MGD tower is $153,200. The exponent in the cost-capacity equation is 0.47.
The cost of a 0.75 million gallon per day induced-draft packed tower is $
Trending now
This is a popular solution!
Step by step
Solved in 2 steps with 1 images
- A 3 year-old a computer-controlled fabric cutting machine, which had a $25,000 purchasing price, has a current market (trade-in) value of $10,000 and expected O&M costs of $4,000, increasing by 1,000 per year. The machine is required to have an immediate repair that costs $2,000. The estimated market values are expected to decline by 20% annually (going forward). The machine can be used for another 7 years at most. The new machine has a $40,000 purchasing price. The new machine's O&M cost is estimated to be $4,000 for the first year, decreasing at an annual rate of $100 thereafter. The firm's MARR is 10%. Assume a unique minimum AEC(10%) for both machines (both the current and replacement machine). Using the information above, determine the economic service life along with the optimum annual equivalent cost of the defender (This is an infinite Horizon decision problem). a) n=4 and AEC=Between $8,400 and $8,800 b) n=4 and AEC=Between $8,000 and $8,400 c) n=5 and AEC=Between $8,400 and…Pendryl Office Supplies is evaluating the profitability of leasing a photocopier for its customers to use on a self serve basis at 10 cents/copy. The copier may be leased for $300 per month plus 1.5 cents per copy on a full service contract. Pendryl can purchase paper at $5 per 500 sheet ream. Toner costs $100 per bottle, which in normal use will last for 5000 pages. Pendryl thinks that there are additional other costs of 0.5 cents per copy. A. How many copies per month must be sold in order to break even? (6000 copies/month) B. What will be the increase in monthly profit for each 1000 copies sold above the break-even point? ($50 per month)You have two design options for your new line of high-resolution monitors for Computer-Aided Design (CAD)workstations. The production run is for 110,000 units. Design option A has a .90 probability of yielding 65good monitors per 100 and a .10 probability of yielding 70good monitors per 100. This design will cost $1,000,000. Design option B has a .80 probability of yielding 65good units per 100 and a .20 probability of yielding 60good units per 100. This design will cost $1,350,000. Good or bad, each monitor will cost $75. Each good monitor will sell for $150. Bad monitors are destroyed and have no salvage value. We ignore any disposal costs in this problem. Demonstrate how decision trees can be used in order to choose the design option based on the above situation. Calculate the expected monetary value (EMV) of each option and determine which option you will propose.
- A plastic injection molding machine operates 334 days a year. It is the bottleneck workstation in a process that produces plastic housed wall clocks. Industrial engineers collected data on the probability of machine breakdowns, the costs of preventive maintenance, and the cost of a breakdown. Number of Molding Machine Breakdowns per Day Probability of a breakdown 0 0.32 1 0.27 2 0.22 3 0.13 4 0.06 The cost of preventive maintenance is high due to performing it between 1 and 4 a.m. each day by two machine experts. The preventive maintenance cost is $2,030 per day including replacement parts, cleaning, and software upgrades. The cost of a breakdown of $1,940 is also high because the downstream workstations can only work until all work-in-progress inventory is completed; then the entire process must stop. What are the economics of the situation? Do not round intermediate calculations. Round your answers to the nearest cent. The expected cost of a breakdown per day is $ The manufacturing…A small aerospace company is evaluating two alternatives: the purchase of an automatic feed machine and a manual feed machine for a finishing process. The auto-feed machine has an initial cost of $23,000, an estimated salvage value of $4000, and a predicted life of 10 years. One person will operate the machine at a rate of $24 per hour. The expected output is 8 tons per hour. Annual maintenance and operating cost is expected to be $3500. The alternative manual feed machine has a first cost of $8000, no expected salvage value, a 5-year life, and an output of 6 tons per hour. However, three workers will be required at $12 per hour each. The machine will have an annual maintenance and operation cost of $1500. All projects are expected to generate a return of 10% per year. How many tons per year must be finished in order to justify the higher purchase cost of the auto-feed machine?A company has a factory that is designed so that it is most eficient (average unit cost is minimized) when producing 15,000 units of output each month. However, it has an absolute maximum output capability of 17,250 units per month, and can produce as little as 7,000 units per month without corporate headquarters shifting production to another plant. If the factory produces 10,925 units in October, what is the capacity utilization rate in October for this factory?
- TemaTire Services (TTS) decided to hire a new mechanic to handle all tire changes for customers ordering a new set of tires. Two mechanics have been shortlisted for the job. One mechanic has limited experience, can be hired for GH¢14 per hour, and can service an average of three customers per hour. The other mechanic has several years of experience, can service an average of four customers per hour, but must be paid GH¢20 per hour. Historical data shows that customers arrive at the TTS garage at the rate of twocustomers per hour. 5a)Assuming Poisson arrivals and exponential service times, compute the following for eachmechanic:(i).Average number of customers waiting(ii).Average number of customers in the system(iii).The average time spent in the queue(iv).The average time spent in the system(v).The probability that no queues would build up(vi).The probability that exactly two customers are waiting at any given time.(vii).The probability that up to two customers are waiting at any…TemaTire Services (TTS) decided to hire a new mechanic to handle all tire changes for customers ordering a new set of tires. Two mechanics have been shortlisted for the job. One mechanic has limited experience, can be hired for GH¢14 per hour, and can service an average of three customers per hour. The other mechanic has several years of experience, can service an average of four customers per hour, but must be paid GH¢20 per hour. Historical data shows that customers arrive at the TTS garage at the rate of twocustomers per hour. 5a)Assuming Poisson arrivals and exponential service times, compute the following for eachmechanic:(i).Average number of customers waiting(ii).Average number of customers in the system(iii).The average time spent in the queue(iv).The average time spent in the system(v).The probability that no queues would build up(vi).The probability that exactly two customers are waiting at any given time.(vii).The probability that up to two customers are waiting at any…Jobs arrive at Loaf Machine Shop. Assume the arrival rate is five jobs per hour. Service times (in minutes per job) do not follow the exponential probability distribution. Two proposed designs for Loaf Machine Shop operation are shown. Design Mean Standard Deviation A 6.0 3.0 B 6.25 0.6 What is the service rate in jobs per hour for each design? For the service rate in part (a), what design appears to provide the best or fastest service rate?
- St. Carmen’s hospital is considering two alternatives and analyzing their consequences over a 3-year period on the hospital budget. Alternative A = hire a pharmacist Alternative B = Buy an automated drug delivery system machine Alternative A’s costs are $90,000 salary plus 20% for fringe benefits per year for the next 3 years Alternative B’s costs for the automated system are $220,000 for the first year, $35,000 for the second year, and $35,000 for the third year. Alternative A’s savings are $150,000 per year for the next 3 years Alternative B’s savings are $120,000 per year for each of the 3 years Assuming a 5% discount rate, calculate: The net benefit of hiring a pharmacist The net benefit of the automated system The benefit-to-cost ratio of hiring a pharmacist The benefit-to-cost ratio for the automated system Which option, alternative A or alternative V, would be chosen based on the following: The net benefit calculations? Why? The…DuLarge Marine manufactures diesel engines for shrimp trawlers and other small commercial boats. One of their automated machines has caused several problems. Over the past 30 weeks, the machine has broken down as indicated below. Each time the machine breaks down, the firm loses an average of $3,000 in time and repair expenses. If preventive maintenance were implemented, it is estimated that an average of only one breakdown per week would occur. The cost of preventive maintenance is $1,000 per week. Number of breakdowns per week 0 1 2 3 4 Frequency (Number of weeks that breakdowns occurred) 8 3 5 9 5 What is the weekly total maintenance cost of this program? Given the following data, find the expected breakdown cost. The cost per breakdown is $200. Number of breakdowns per week 0 1 2 3 4 Weekly frequency 5 12 10 18 5 13) Great Southern Consultants Group's computer system has been down several times over the…Tema Tire Services (TTS) decided to hire a new mechanic to handle all tire changes for customers ordering a new set of tires. Two mechanics have been shortlisted for the job. One mechanic has limited experience, can be hired for GH¢14 per hour, and can service an average of three customers per hour. The other mechanic has several years of experience, can service an average of four customers per hour, but must be paid GH¢20 per hour. Historical data shows that customers arrive at the TTS garage at the rate of two customers per hour. b) If the company assigns a customer waiting cost of GH¢30 per hour, which mechanic provides the lower operating total cost (TC)? c) With the aid of a sketch, show the economic relationship between service cost and waiting costs, and justify whether or not it is necessary for TTS to keep investing in better and/or additional mechanics until waiting time reduces to ze