Estimate the TOTAL COST needed for Excavation, Gravel Bedding, and Concreting Works (Excavation + Cement + Gravel + Sand). Do not round off your answer. Parameters to consider: No allowance or factor of waste. Use Class AA Excavation Cost = 300 pesos per sq.m. Use 40 kgs bag Cement = 300 pesos per bag 100 mm thick gravel bed (include this in estimate) Sand = 1000 pesos per per sq.m. All footings lie on gravel bed (except FTB) Gravel = 900 pesos per per sq.m. D=1.53, I=16, and J=24 givens are in meter. What to estimate: For Earthworks: • Footing and Footing Tie Beam For Concreting Works: • Footing • Footing Tie Beam • Columns Additional: • Gravel Bed (Estimate the volume needed and include the cost in the total cost) GIVEN: A= 1530 B= 330 C= 1630 D= 1.53 E= 430 F= 480 G= 280 H= 860 I= 16 J= 24
Problem
Estimate the TOTAL COST needed for Excavation, Gravel Bedding, and Concreting Works
(Excavation + Cement + Gravel + Sand). Do not round off your answer.
Parameters to consider:
No allowance or factor of waste. Use Class AA
Excavation Cost = 300 pesos per sq.m. Use 40 kgs bag
Cement = 300 pesos per bag 100 mm thick gravel bed (include this in estimate)
Sand = 1000 pesos per per sq.m. All footings lie on gravel bed (except FTB)
Gravel = 900 pesos per per sq.m. D=1.53, I=16, and J=24 givens are in meter.
What to estimate:
For Earthworks:
• Footing and Footing Tie Beam
For Concreting Works:
• Footing
• Footing Tie Beam
• Columns
Additional:
• Gravel Bed (Estimate the volume needed and include the cost in the total cost)
GIVEN:
A= 1530
B= 330
C= 1630
D= 1.53
E= 430
F= 480
G= 280
H= 860
I= 16
J= 24
![Foundation Plan
Typical Isolated Footing Cross-section
NGL
Column
FTB
FTB](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F5f727f8d-9081-4eae-9634-36af6461b65f%2Fb0b55fa8-0dc9-4374-acc7-ff8876cca31e%2Fj0w2x64_processed.jpeg&w=3840&q=75)
![Isolated Footing Schedule
DIMENSIONS (mm)
EMBEDMENT
FOOTING
(mm)
DEPTH
F1
A
A
B
F2
B
13
Column Schedule
COLUMN
SHORT
LONG
C1
E
E
C2
Beam Schedule
DIMENSION
BEAM
B
D
FTB-1
G
H](/v2/_next/image?url=https%3A%2F%2Fcontent.bartleby.com%2Fqna-images%2Fquestion%2F5f727f8d-9081-4eae-9634-36af6461b65f%2Fb0b55fa8-0dc9-4374-acc7-ff8876cca31e%2F1yj9me_processed.jpeg&w=3840&q=75)
![](/static/compass_v2/shared-icons/check-mark.png)
Step by step
Solved in 2 steps with 4 images
![Blurred answer](/static/compass_v2/solution-images/blurred-answer.jpg)
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
![Structural Analysis](https://compass-isbn-assets.s3.amazonaws.com/isbn_cover_images/9781337630931/9781337630931_smallCoverImage.jpg)
![Structural Analysis (10th Edition)](https://www.bartleby.com/isbn_cover_images/9780134610672/9780134610672_smallCoverImage.gif)
![Principles of Foundation Engineering (MindTap Cou…](https://www.bartleby.com/isbn_cover_images/9781337705028/9781337705028_smallCoverImage.gif)
![Fundamentals of Structural Analysis](https://www.bartleby.com/isbn_cover_images/9780073398006/9780073398006_smallCoverImage.gif)
![Sustainable Energy](https://www.bartleby.com/isbn_cover_images/9781337551663/9781337551663_smallCoverImage.gif)
![Traffic and Highway Engineering](https://www.bartleby.com/isbn_cover_images/9781305156241/9781305156241_smallCoverImage.jpg)