Premier Consulting's two consultants, Avery and Baker, can be scheduled to work for clients up to a maximum of 160 hours each over the next four weeks. A third consultant, Campbell, has some administrative assignments already planned and is available for clients up to a maximum of 140 hours over the next four weeks. The company has four clients with projects in process. The estimated hourly requirements for each of the clients over the four-week period are as follows. Client Hours 1 A B C D 12 3 4 Avery 180 75 Baker 100 Hourly rates vary for the consultant-client combination and are based on several factors, including project type and the consultant's experience. The rates (dollars per hour) for each consultant-client combination are as follows. 85 Consultant A B C D 100 125 115 100 120 135 115 120 1 Client 2 3 Campbell 155 150 140 130 (a) Develop a network representation of the problem. (Submit a file with a maximum size of 1 MB.) Choose File No file chosen This answer has not been graded yet. (b) Formulate the problem as a linear program, with the optimal solution providing the hours each consultant should be scheduled for each client to maximize the consulting firm's billings. (i) Let x = number of hours from consultant i assigned to client j, using the indices from the tables. For example, X₁4 is the number of hours Campbell spends with Client D.

Practical Management Science
6th Edition
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:WINSTON, Wayne L.
Chapter12: Queueing Models
Section: Chapter Questions
Problem 59P
icon
Related questions
Question
Premier Consulting's two consultants, Avery and Baker, can be scheduled to work for clients up to a maximum of 160 hours each over the next four weeks. A third consultant, Campbell, has some administrative
assignments already planned and is available for clients up to a maximum of 140 hours over the next four weeks. The company has four clients with projects in process. The estimated hourly requirements for
each of the clients over the four-week period are as follows.
Client
A
B
C
D
2
3
Avery
4
Hours
Baker
180
Campbell
75
Hourly rates vary for the consultant-client combination and are based on several factors, including project type and the consultant's experience. The rates (dollars per hour) for each consultant-client combination
are as follows.
100
Consultant A
85
Client
B
100 125 115 100
120 135
с
115 120
155 150 140 130
This answer has not been graded yet.
(a) Develop a network representation of the problem. (Submit a file with a maximum size of 1 MB.)
Choose File No file chosen
(b) Formulate the problem as a linear program, with the optimal solution providing the hours each consultant should be scheduled for each client to maximize the consulting firm's billings.
(i) Let Xij
= number of hours from consultant i assigned to client j, using the indices from the tables. For example, X34 is the number of hours Campbell spends with Client D.
Transcribed Image Text:Premier Consulting's two consultants, Avery and Baker, can be scheduled to work for clients up to a maximum of 160 hours each over the next four weeks. A third consultant, Campbell, has some administrative assignments already planned and is available for clients up to a maximum of 140 hours over the next four weeks. The company has four clients with projects in process. The estimated hourly requirements for each of the clients over the four-week period are as follows. Client A B C D 2 3 Avery 4 Hours Baker 180 Campbell 75 Hourly rates vary for the consultant-client combination and are based on several factors, including project type and the consultant's experience. The rates (dollars per hour) for each consultant-client combination are as follows. 100 Consultant A 85 Client B 100 125 115 100 120 135 с 115 120 155 150 140 130 This answer has not been graded yet. (a) Develop a network representation of the problem. (Submit a file with a maximum size of 1 MB.) Choose File No file chosen (b) Formulate the problem as a linear program, with the optimal solution providing the hours each consultant should be scheduled for each client to maximize the consulting firm's billings. (i) Let Xij = number of hours from consultant i assigned to client j, using the indices from the tables. For example, X34 is the number of hours Campbell spends with Client D.
Expert Solution
trending now

Trending now

This is a popular solution!

steps

Step by step

Solved in 2 steps with 6 images

Blurred answer
Similar questions
  • SEE MORE QUESTIONS
Recommended textbooks for you
Practical Management Science
Practical Management Science
Operations Management
ISBN:
9781337406659
Author:
WINSTON, Wayne L.
Publisher:
Cengage,