Question: Calculate the Solar Energy potential (GWh) that can be generated on Annual Basis if 50,000km2of the area of Jordan was covered with Solar PV modules. List your assumptions: Solar PV estimated generation = 2GWh/MWp Each 1MWp will need = 10,000m2 Cost of fossil fuel to generate electricity in Jordan = 1000 million JD/year Annual Electricity Generated in Jordan = 20,000 GWh Required Calculate Solar Energy potential by Dividing the Electricity generated from PV over 50,000km2 / Annual Electricity Generated?
Question: Calculate the Solar Energy potential (GWh) that can be generated on Annual Basis if 50,000km2of the area of Jordan was covered with Solar PV modules. List your assumptions: Solar PV estimated generation = 2GWh/MWp Each 1MWp will need = 10,000m2 Cost of fossil fuel to generate electricity in Jordan = 1000 million JD/year Annual Electricity Generated in Jordan = 20,000 GWh Required Calculate Solar Energy potential by Dividing the Electricity generated from PV over 50,000km2 / Annual Electricity Generated?
Principles of Physics: A Calculus-Based Text
5th Edition
ISBN:9781133104261
Author:Raymond A. Serway, John W. Jewett
Publisher:Raymond A. Serway, John W. Jewett
Chapter1: Introduction And Vectors
Section: Chapter Questions
Problem 23P
Related questions
Topic Video
Question
Question: Calculate the Solar Energy potential (GWh) that can be generated on Annual Basis if 50,000km2of the area of Jordan was covered with Solar PV modules.
List your assumptions:
- Solar PV estimated generation = 2GWh/MWp
- Each 1MWp will need = 10,000m2
- Cost of fossil fuel to generate electricity in Jordan = 1000 million JD/year
- Annual Electricity Generated in Jordan = 20,000 GWh
Required
- Calculate Solar Energy potential by Dividing the Electricity generated from PV over 50,000km2 / Annual Electricity Generated?
- You are going to Build a Solar PV Plant to cover the Annual Electricity Needs of Jordan
- What is the Size of the plant?
- Calculate Present Value (P), if the cost of the 1MWp = 500,000JD.
- If the cost of Generation of Electricity in Jordan is 0.10JD/KWh, what is the Simple Payback Period (SPP)?
- What is the annual electricity saving (A0) if the degradation is 1%?
- What is (A1) if the operation, maintenance and cleaning is 2% of initial cost?
- What is the Salvage (S) value if you can sell the system for 5% of cost?
Expert Solution
This question has been solved!
Explore an expertly crafted, step-by-step solution for a thorough understanding of key concepts.
Step by step
Solved in 2 steps
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, physics and related others by exploring similar questions and additional content below.Recommended textbooks for you
Principles of Physics: A Calculus-Based Text
Physics
ISBN:
9781133104261
Author:
Raymond A. Serway, John W. Jewett
Publisher:
Cengage Learning
Physics for Scientists and Engineers: Foundations…
Physics
ISBN:
9781133939146
Author:
Katz, Debora M.
Publisher:
Cengage Learning
Physics for Scientists and Engineers, Technology …
Physics
ISBN:
9781305116399
Author:
Raymond A. Serway, John W. Jewett
Publisher:
Cengage Learning
Principles of Physics: A Calculus-Based Text
Physics
ISBN:
9781133104261
Author:
Raymond A. Serway, John W. Jewett
Publisher:
Cengage Learning
Physics for Scientists and Engineers: Foundations…
Physics
ISBN:
9781133939146
Author:
Katz, Debora M.
Publisher:
Cengage Learning
Physics for Scientists and Engineers, Technology …
Physics
ISBN:
9781305116399
Author:
Raymond A. Serway, John W. Jewett
Publisher:
Cengage Learning
College Physics
Physics
ISBN:
9781285737027
Author:
Raymond A. Serway, Chris Vuille
Publisher:
Cengage Learning