The GEM maker of jewelry makes two bracelet designs, heart design and flower design. The bracelets are made of gold and platinum. The store has 28 ounces of gold and 20 ounces of platinum. Each heart design bracelet requires 3 ounces of gold and 2.5 ounces of platinum and makes a profit of P2500, while each flower design bracelet requires 4.5 ounces of gold and 3 ounces of platinum and makes a profit of P3400. How many heart design bracelets and flower design bracelets should be produced to maximize the profit? Decision variables Tabulation Objective function and constraints Graph and solution Optimum solution Decision
Q: A company estimates that it will take 20 hours and 42 direct labor hours to construct the 50th and…
A: Production is the process of converting raw materials into final goods that will be used for…
Q: Q/ Find the best solution for Solving linear po vogramming problems in a knock BigfM method MinZ=…
A:
Q: a. Which of the two suppliers would provide the lowest annual cost to Weekend Projects? What…
A:
Q: Types of product Capacity in min Source A C F1 3 1 20 F2 5 4 8 15 F3 6. 30 Demand is $ 20 30 25
A: Since the matrix is unbalanced i.e. supply is not equal to demand. We need to insert a dummy row F4…
Q: What needs to be done so results in delivery of project work reflect specified product scope? O a.…
A: Prodcut scope is defined as features that characterize a product or a service.
Q: Activity 8 Shown below are the tasks, tir to assemble a copier machine. or- 40..nite
A: Given: Production time per day=480 minutes Output per day=40units Task Task Time mins Immediate…
Q: n1=10,n2=14.find F critical value?
A: Given: Sample sizes n1 = 10 and n2 = 14
Q: d. Determine the probability that the team and the contractor will be in place and the project…
A: Based on the 3-time estimates given, we find the Expected duration and Variance for each activity as…
Q: Use a preference matrix to calculate the total weighted score for each supplier. The weighted score…
A:
Q: a. Determine the expected project completion time and the variance. b. What is the project's…
A: The critical path is a method to find the shortest duration by which a project can be completed with…
Q: A project's activities must be completed in the sequence indicated below. Activity Duration…
A: A network diagram is a visual representation of a project which helps to identify the critical path…
Q: as per policy, in no case shall the minimum composite Score be lower than 89.0 second best garnered…
A:
Q: There are several different perspectives of quality, including the operations perspective, the…
A: FedEx corporation which was previously known as Federal Express corporation is a well known American…
Q: What are the five inputs and two outputs of an operations transformation process? For th
A: Operations transformation Process: Any activity or combination of operations that takes one or more…
Q: How can risk be assessed? How do risk assessments work?
A: Risk assessment is a term used to describe the overall process or strategy where you: Identify…
Q: Given the data for a project in table Q3, using the following 1. 8 hours as working day 2. The…
A: Since you have posted a question with multiple sub-parts, we will solve first three sub-parts for…
Q: How are disturbances managed and what influence do they have on the machine's capacity to operate?
A: Disturbance is any situation other than the normal and standard operating conditions for any…
Q: How does an MDP augment a stationary Markov chain?
A: A Markov chain process (MDP) is defined by Set "S" of states Set "A" of actions P (St+1/St, At)…
Q: Identify and explian how you will manage : One specific project management risk on a bookstore…
A: There are number of risks which might be faced by a bookstore website. A website must be designed in…
Q: Typewritten for upvote. Thank you
A: Gross pay is the total earning of an employee earns for the time he or she has worked. It includes…
Q: 5-6 5-7 6-8 7-8 8-10 9-10 1-2 1-3 2-4 3-4 3-5 4-9 6. Construct the network and find critical path.…
A: A network diagram is a visual representation of a project which helps to calculate the project…
Q: Drivers who come to get their licenses at the Department of Motor Vehicles have their photograph…
A:
Q: Explain Five Phases of Project Management with examples.
A: Project management is the management in which different kinds of skills, knowledge, and techniques…
Q: Problem: Yankee is the Plant Manager of Reebok International limited and he wants to determine the…
A: Decision variables: Let x be the number of Classic rubber shoes…
Q: ncial, operational, customer, supplier and shareholder interests) are likely to result from an 84%…
A: Forecasting strategies and approaches that might be used to enhance a company's performance have…
Q: Problem 1: The following data was taken from experiment. The data can be modeled by the following…
A: given,
Q: DaShu is a retailer store that sells T-shirts to its customers. Suppose the customer demand in a…
A: Mean customer demand = 1000 units Standard deviation = 300 units Service level = 90%
Q: Given the following data for demand at the XYZ Company, calculate the monthly forecast using a…
A: given,
Q: explain the expression "collaborate closely with suppliers to maximize the efficiency of the retail…
A: Supply chain management - is the management of the whole production flow of the products or services…
Q: You are the project manager on a $1,000,000 housing development project that has an estimated…
A: Total budget = $1,000,000 Duration of the project = 5 months Estimated project completion at the end…
Q: The table below shows the complete project plan and includes all the activities with its immediate…
A: A network diagram is a visual representation of a project which helps to calculate the project…
Q: An electronics firm is currently manufacturing an item that has a variable cost of $.50 per unit and…
A:
Q: The Sime to assemble the first na production line is 19 hours. The leaming rate is 0.92.…
A: Given data: Time to assemble the first unit(T1) = 19hours Learning rate(p) = 0.92
Q: The main techniques of Qualitative Analysis and those of Quantitative Analysis, their strengths and…
A: What Is Process Analyzing? Business Process Management includes many phases, one of which is called…
Q: Discuss the following: 1. Bill of Lading (BOL) and its importance in shipping. Support your…
A: Bill of lading is a document issued by the shipping company notifying the quantity and types of…
Q: What does quality customer service mean to you?
A: Quality refers to the ability of the firm to provide the product and services to its customers which…
Q: A company has an annual demand for a product of 2000 units, a carrying cost of $20 per unit per…
A:
Q: If a workstation can produce 1000 units in 100 hours and the actual workstation efficiency is only…
A: If , the workstation can produce 1000 units in 100 hours, then the standard output rate for 2000…
Q: mpany (Choose any Company) Now write Recommendation and Managerial implicatio
A: INTRODUCTION A nonalcoholic beverage concentrates and syrups maker, marketer, and distributor, the…
Q: If cycle inventory is 1,000 and the average flow time is 4 weeks, then the number of replenishments…
A:
Q: What are some problems that can arise when each stage of a supply chain focuses solely on its own…
A: The question explores what problems can occur if each level of the supply chain is only concerned…
Q: Question one What challenges have been faced by various bodies when implementing e- procurement in…
A: E-procurement is the business-to-business, business-to-consumer purchase and sales of supplies and…
Q: What are Decision Patterns for Manufacturing Processes and how do they work?
A: Manufacturing is the process where tremendous products and services are seen the world for the first…
Q: Why are environmental concerns and sustainability often addressed in the operations function?
A: Environmental sustainability entails engaging appropriately with the world in order to preserve…
Q: According to Table 8-2, what is the optimal solution? A Solution is unbounded B Solution is…
A: An optimal solution is that which satisfies the constraints with the objective function of minimum…
Q: the role of professional and personal development in enhancing your skills in your work (Flight…
A: Skill development can be stated as the approach of the recognization of the expertise or skill gap…
Q: Suppose it is decided that the number of hours used in the assembly process must be at least 80% of…
A:
Q: The following table gives the map coordinates and the shipping loads for a set of cities that we…
A: Given data: City Map co-ordinate (x,y) Shipping load A (5,10) 5 B (6,8) 10 C (4,9) 15 D…
Q: company's bids for such sites have been successful. However, the company is also under pressure to…
A: A decision tree helps to analyze various alternatives available in a graphical/diagrammatical manner…
Q: Discuss five reasons why a project manager could utilise a Gantt chart as a tool, using one software…
A: Gantt chart:- A project manager could utilize a Gantt chart when scheduling tasks in order to…
Direction: Analyze the given problem and show your complete solution.
The GEM maker of jewelry makes two bracelet designs, heart design and flower design. The bracelets are made of gold and platinum. The store has 28 ounces of gold and 20 ounces of platinum. Each heart design bracelet requires 3 ounces of gold and 2.5 ounces of platinum and makes a profit of P2500, while each flower design bracelet requires 4.5 ounces of gold and 3 ounces of platinum and makes a profit of P3400. How many heart design bracelets and flower design bracelets should be produced to maximize the profit?
- Decision variables
- Tabulation
- Objective function and constraints
- Graph and solution
- Optimum solution
- Decision
Step by step
Solved in 6 steps with 2 images
- The Tinkan Company produces one-pound cans for the Canadian salmon industry. Each year the salmon spawn during a 24-hour period and must be canned immediately. Tinkan has the following agreement with the salmon industry. The company can deliver as many cans as it chooses. Then the salmon are caught. For each can by which Tinkan falls short of the salmon industrys needs, the company pays the industry a 2 penalty. Cans cost Tinkan 1 to produce and are sold by Tinkan for 2 per can. If any cans are left over, they are returned to Tinkan and the company reimburses the industry 2 for each extra can. These extra cans are put in storage for next year. Each year a can is held in storage, a carrying cost equal to 20% of the cans production cost is incurred. It is well known that the number of salmon harvested during a year is strongly related to the number of salmon harvested the previous year. In fact, using past data, Tinkan estimates that the harvest size in year t, Ht (measured in the number of cans required), is related to the harvest size in the previous year, Ht1, by the equation Ht = Ht1et where et is normally distributed with mean 1.02 and standard deviation 0.10. Tinkan plans to use the following production strategy. For some value of x, it produces enough cans at the beginning of year t to bring its inventory up to x+Ht, where Ht is the predicted harvest size in year t. Then it delivers these cans to the salmon industry. For example, if it uses x = 100,000, the predicted harvest size is 500,000 cans, and 80,000 cans are already in inventory, then Tinkan produces and delivers 520,000 cans. Given that the harvest size for the previous year was 550,000 cans, use simulation to help Tinkan develop a production strategy that maximizes its expected profit over the next 20 years. Assume that the company begins year 1 with an initial inventory of 300,000 cans.Mary is a sales person for Challenge Furniture. She receives an incremental commission based on the table below. If she sells $26,000 and has already received a draw of $766.15, how much commission is still owed to Mary? level 1 1-11,700 3.7% sales volume 2 11,701-21,200 4.3% commission rate 3 over 21,200 4.7%Assuming your company is producing Apple and Samsung phone cases. It is required to process in the assembly and paint shops to make either phone case. It takes 1/60 of a day and 1/40 of a day to paint an Apple case and a Samsung case in the paint shop, respectively. It takes 1/50 of a day to assemble either type of case in the assembly shop. An Apple phone case and a Samsung phone case yield profits of $300 and $220, respectively, per case sold. What is a maximum-profit daily production plan for your company?
- Alice, Wonder, and Land are freshmen under the marketing management program. Every month, they purchase a piece of Panda ballpen. The price of the ball pen is Php9.50.According to a recent survey, 45% of the marketing freshmen have the samepurchasing behavior as Alice, Wonder, and Land. Another 30% also purchase Panda ballpens regularly at the same price; however, they purchase once every 2 weeks. There are approximately 280 freshmen under the marketing management program. Assuming that the behavior is consistent throughout their 4-year stay in the program, what is the approximate projected revenue that can be generated from the marketing freshmen for the entire duration of their stay in the program?Monica Britt has enjoyed sailing small boats since she was 7 years old, when her mother started sailing with her. Today, Monica is considering the possibility of starting a company to produce small sailboats for the recreational market. Unlike other mass-produced sailboats, however, these boats will be made specifically for children between the ages of 10 and 15. The boats will be of the highest quality and extremely stable, and the sail size will be reduced to prevent problems of capsizing. Her basic decision is whether to build a large manufacturing facility, a small manufacturing facility, or no facility at all. With a favourable market, Monica can expect to make R90,000 from the large facility or R60,000 from the smaller facility. If the market is unfavourable, however, Monica estimates that she would lose R30,000 with a large facility and she would lose only R20,000 with the small facility. Because of the expense involved in developing the initial moulds and acquiring the…Monica Britt has enjoyed sailing small boats since she was 7 years old, when her mother started sailing with her. Today, Monica is considering the possibility of starting a company to produce small sailboats for the recreational market. Unlike other mass-produced sailboats, however, these boats will be made specifically for children between the ages of 10 and 15. The boats will be of the highest quality and extremely stable, and the sail size will be reduced to prevent problems of capsizing. Her basic decision is whether to build a large manufacturing facility, a small manufacturing facility, or no facility at all. With a favourable market, Monica can expect to make R90,000 from the large facility or R60,000 from the smaller facility. If the market is unfavourable, however, Monica estimates that she would lose R30,000 with a large facility and she would lose only R20,000 with the small facility. Because of the expense involved in developing the initial moulds and acquiring the…
- Method of Least Squares, Goodness of Fit Deepa Dalal opened a free-standing radiology clinic. She had anticipated that the costs for the radiological tests would be primarily fixed, but she found that costs increased with the number of tests performed. Costs for this service over the past nine months are as follows: Month Radiology Tests Total Cost January 2,800 $133,500 February 2,600 135,060 March 3,100 175,000 April 3,500 170,600 May 3,400 176,900 June 3,700 186,600 July 3,840 174,450 August 4,100 195,510 September 3,450 185,300 Required: 1. Compute the cost formula for radiology services using the method of least squares. If required, round your answers to two decimal places. Y = + X 2. Using the formula computed in Requirement 1, what is the predicted cost of radiology services for October for 3,500 appointments? (Round the answer to the nearest dollar.)Company X manufactures four different types of toys for kids including cars, bikes, plane and ship. The gross margin, production, and profit are listed below for each items are shown below: Product Gross margin/unit Minutes/unit Gross margin/minute Maximum production 280000 112000 Profit Car Bike Plane Ship 0.3 1.3 0.75 1.2 1 2.5 1.5 2 0.30 0.52 0.50 0.60 18667 140000 84000 145600 14000 168000 Let the production capacity of the machine used for production is 4500 hours per year. Which of the following would be the minimum value of gross margin per minute of ship that would make it economical for production? (A)0.65 (B) 0.70 (C) 0.87 (D) Can't be determinedRadiant wants to hire Cargo planes for transporting their goods. They contacted VIP Transportation Company to hire Cargo planes. VIP informed that they can provide two types of Cargo Planes. In addition, they provided the following cost related information about the two types Cargo planes- WT88 and BH54: Personnel Cost Fuel Cost Maintenance Cost WT88 2000 1000 2000 BH54 2500 1500 1000 Radiant has $200,000 to spend in personnel cost, $160,000 in fuel cost, and $80,000 in maintenance cost. Moreover, they have to hire at least two of each type of planes. If WT88 can carry 55 tons of goods and BH54 can carry 85 tons of goods, then find out the following using Linear Programming: What is the maximum amount Radiant can carry given their budget constraint? Can you solve using solver ? (I did this but I got a wrong answer) Data Personnel Cost Fuel Cost Maintenance Cost Tons WT88 2000 1000 2000 55…
- A dietitian has been asked by the athletic director to develop a snack that athletes can use in their training programs. The dietitian intends to mix two seperate products to make the snack. The following information (on the table below): Product A costs Php20 per ounce, while Product B costs Php10 per ounce. Determine the optimal quantities of each product that will give the minimized cost.A Las Vegas, Nevada, manufacturer has the option to make or buy one of its component parts. The annual requirement is 20,000 units. A supplier is able to supply the parts for $10 per piece. The firm estimates that it costs $600 to prepare the contract with the supplier. To make the parts in-house, the firm must invest $50,000 in capital equipment, and the firm estimates that it costs $8 per piece to make the parts in-house. Assuming that cost is the only criterion, use breakeven analysis to determine whether the firm should make or buy the item. 1. What is the breakeven quantity? 2. Should the manufacturer Make or Buy? 3. What is the cost savings using your decision in number 2 (above)? Show the total cost for each scenario then the savings amount.Sapphire Farm is a business that trains and boards horses and educates young riders about horse care, nutrition, a product focusand riding. The farm provides both a learning and a fun environment for young equestrians and their families. It also hosts horse shows for beginning riders to help them build confidence in the show ring and to prepare them for local horse shows by running shows in accordance with the rules and regulations of the National Hunter Jumper Association. Feedback from the horseshow judges are provided to all riders so they can do better at their next meet. In addition, all warm-up and training areas are fenced and monitored by adults for the children's safety.According to the service-profit chain, the high-value service offered by Sapphire Farm LLC should lead to: A. congruent market response B. positive framing C. customer autonomy D. customer satisfaction E. a product focus