Vollmer Manufacturing makes three components for sale to refrigeration companies. The components are processed on two machines: a shaper and a grinder. The times (in minutes) required on each machine are as follows: Component 1 2 3 Shaper 6 4 Machine 4 Grinder 4 5 2 The shaper is available for 120 hours, and the grinder for 110 hours. No more than 250 units of component 3 can be sold, but up to 1,000 units of component 1 and up to 1,000 units of component 2 can be sold. In fact, the company already has orders for 550 units of component 1 that must be satisfied. The per unit selling price and per unit variable costs for each of the three components are as follows:
Q: Q 17.1- Determine the reorder point that will achieve 98 % service leys"
A: Inventory management is the process of ordering, storing, using, and selling the inventory of the…
Q: what is linear programming, explain all the important aspects of linear programming.
A: Today, optimization is a need. This entire universe is based on the idea of optimization. It is used…
Q: Edwards Machine Tools needs to purchase a new machine. The basic model is slower but costs less,…
A: The maximum payoff for the basic model is $155,000 and the minimum payoff is $90,000 The maximum…
Q: Mountain States Electric Service is an electrical utility company serving several states in the…
A: If the utility replaces the PCB transformer- Cost $85,000 If the company decides to keep the…
Q: ombro Industries is in the process of automating one of its plants and developing a flexible…
A: Given data: Month 1 2 3 4 Wait time /order before - start of production 9 10.9 12 14…
Q: In order to build large production units and expedite certain routine government actions related to…
A: Ans) Bribes are illegal money or gifts given for some favours.This is illegal Speed money is given…
Q: Houston North Hospital is trying to improve its image by providing a positive experience for its…
A: Firstly, Calculating Fraction Size: Day No. of Unsatisfied Patients Sample Size Size Fraction 1…
Q: Phillip Witt, president of Witt Input Devices, wishes to create a portfolio of local suppliers for…
A: Find the Calculation methods below: EMV (One Supplier) = (Shutdown cost * Probability of Super…
Q: What are the objectives of total quality management in operation management ?
A: Introduction : Total Quality Quality Management is an approach of operation management. Total…
Q: Discuss characteristics of successful e-tailing Discuss how internet job market has thrived in…
A: Disclaimer:- Since you have asked multiple questions, as per the authoring guidelines, we will…
Q: An investor is given the following investment alternatives and percentage rates of return: 22/11/200…
A: In the given table, the percentage rates of return are given against each market scenario and…
Q: Gregory has started a small agricultural business that specialises in maize and sunflower seeds in…
A: MRP systems A material resource planning system is a computer-based information system that helps in…
Q: 7 69 6 8 5 3 4 Assume the lead time is 1.5 weeks, the inventory period is 4.6 weeks, and the…
A: Economic order quantity (EOQ) is the optimal order quantity that helps in minimizing the total…
Q: Question 1 A firm practices a chase strategy. Production last quarter was 800. Demand over the next…
A: Given data is Quarter 1 2 3 4 Demand 1000 1000 800 700 Last quarter production = 800 Hiring…
Q: Supply chain configuration represents how the participating company members relate to each other to…
A: Companies may usually desire or expect to have complete control over their entire supply chain…
Q: engineering can play in the restructur
A: In order to achieve significant increases in productivity, cycle times, and quality, business…
Q: Examining trade-offs between IT and traditional logistics functions is better than focusing on IT…
A: Only focusing on the IT contracts is the area of performance and growth. Concentration on…
Q: a) Assign the processes to the initial work areas and draw the total flow.
A: Operation management is performed in each manufacturing organization. It all deals with the…
Q: n managemen
A: Operations departments place a high priority on quality management. Even though all workers and…
Q: Cox Electric makes electronic components and has estimated the following for a new design of one of…
A: Find the Calculation methods below: Production Volume = 0 to 100000Material Cost = Production volume…
Q: Briefly explain how "composition of board" would be in good governance
A: The board of directors of an organization should have regular meetings, maintain control over the…
Q: The Iteration 2 of the given transportation model by NWCR is optimal. What is the delivery schedule…
A: Find the Transportation table below: Transportation Table Destination P Q R S…
Q: Organisational structure plays a critical role in the effective implementation of strategy. The span…
A: The number of workers under a single supervisor's authority, or span of control, varies between…
Q: If D = 8,500 per month, S =$46 per order, and H =$2.00 per unit per month, a) What is the…
A: Economic order quantity is optimal order quantity. It is calculated with following formula Economic…
Q: A bagel store orders cream cheese from three suppliers, Cheesy Cream Corp. (CCC), Super Smooth &…
A: Assume Cheesy Cream Corp. (CCC) = A Super Smooth & Sons (SSS) = B Bagel's Best Friend Co. (BBF)…
Q: Employee Wanda Trews was working in the manufacturing facility at Coves Industrial. The employees of…
A: The detailed solution is given in Step 2
Q: Explain any 5 difference between PERT and CPM
A: A network diagram related to the project shows the sequence of the task that is performed to…
Q: The M. M. Pod Company is a retail chain that specializes in camping equipment. They carry a special…
A: Economic order quantity (EOQ) is the optimal order quantity that helps in minimizing the total…
Q: A company can produce a part it uses in an assembly operation at the rate of 50 an hour. The company…
A: Economic run quantity or Economic production quantity (EPQ) is the optimal quantity that a company…
Q: Which of the following aspects of supply chain management have strong connections? (Check all that…
A:
Q: A company manufactures x units of Product A and y units of Product B, on two machines, I and II. It…
A: Linear programming is a mathematical technique that is also used in operations management…
Q: Resource Allocation Your salami manufacturing plant can order up to 1,000 pounds of pork and 2,400…
A: Given data is Product Count Dracula Frankenstein Pork (pounds) 1 2 Beef (pounds) 3 2…
Q: Rocky Mountain Tire Center sells 13,000 go-cart tires per year. The ordering cost for each order is…
A: Optimal order quantity is the economic order quantity . It is allow the firm to optimize the…
Q: Read the articles below and answer the questions that follow. South Africa’s indigenous rooibos tea…
A: Integrated Logistics Support (ILS) is a technical process which imbibes support and logistics…
Q: a) For what value of ordering cost would its action be optimal? Its action would be optimal given…
A: Given the data stated below, The annual carrying cost per unit=0.40 of the unit cost The annual…
Q: Problem 11-18 (Algo) 1-mart is a discount optical shop that can fill most prescription orders in…
A: Given that hour break for lunch for Optometrist, So (12-1) = 11 Also given that, Process can run 6…
Q: c) If Overnight Shipping's ratings for each of the factors increase by 10%, what are the new…
A: Given data: Criterion Weight Overnight Shipping Worldwide Delivery United Freight Quality 5 84…
Q: Question 2 An oil company must decide whether or not to drill an oil well in a particular area that…
A:
Q: Use the following payoff table to complete parts (a) through (j). The probability of event 1 is…
A: Given data is
Q: Suppose a certain manufacturing company produces connecting rods for 4- and 6-cylinder automobile…
A: Decision variable: Suppose-x4 = the number of 4-cylinder connecting rods produced next week.x6 = the…
Q: Hart Manufacturing makes three products. Each product requires manufacturing operations in three…
A: Decision Variables: Suppose-P1 = Units of Product 1 to be producedP2 = Units of Product 2 to be…
Q: Based on the sampling done, the control limits for 3-sigma x chart are: Upper Control Limit…
A: Formulae used: For x chart: Control limit Upper control Limit(UCLX) = X double bar + A2×R bar Lower…
Q: AAA auto supply store sells snow tires which are ordered every Friday to meet next week's demand.…
A: Given data: Sales price = $50 per tireCost of tire =$35 Carrying cost = $2 per tire Order…
Q: Problem 12-7 (Algo) The following table lists all costs of quality incurred by Sam's Surf Shop last…
A: The quality cost is the total cost incurred by a company for having lower-than-perfect quality as…
Q: A copier store has four pieces of automatic equipment, but sometimes they are down because they need…
A: There are four pieces that need maintenance. Hence, this is a finite calling population queue.…
Q: Twelve samples, each containing five parts, were taken from a process that produces steel rods at…
A: Given- Sample means and ranges table-
Q: Boardwalk Electronics manufactures 300,000 circuit boards per month. A random sample of 7,000 boards…
A: Given data: Random sample = 7000 boards Defects in one characteristic = 6 Defects in other 5…
Q: If D = 8,500 per month, S = $46 per order, and H = $2.00 per unit per month, Part 2 a)…
A: EOQ considers the cost of placing an order, the cost of storing goods, and the time of restocking.…
Q: Hi, the answer says it is incorrect. Could the numbers be wrong? thanks so much.
A: Yes. There was a bit wrong in the constraints part. 5 hours are to be taken as 5*60 = 300 minutes…
Q: Read the summary below and answer the questions that follow: The Orange Girl – all the juice and…
A: Inventory carrying cost: - The cost incurred to the company for storing the products after…
help!
Trending now
This is a popular solution!
Step by step
Solved in 3 steps with 14 images
- Mpho is an avid seamstress and want to sew and sell high quality, reusable, designer face masks during the current Covid-19 pandemic. She will design and sew the masks herself and use her automatic embroidery machine to put her logo on each mask sold. With the help of her son, deliveries will be made all over Gauteng within 3 days of placing the order. Every mask will have a unique threelayer design with adjustable straps to ensure comfort and fit. Mpho’s only expense is the material needed to sew the masks and delivery costs. At this stage, Mpho’s target market is limited to Gauteng. Draw a diagram to illustrate the transformation process of Mpho’s new business. Be sure to include all relevant elements, headings and arrows to indicate the flow of products/ servicesThe Goodparts Company produces a component that is subsequently used in the aerospace industry. The component consists of three parts (A, B, and C) that are purchased from outside and cost 35, 30, and 10 cents per piece, respectively. Parts A and B are assembled first on assembly line 1, which produces 185 components per hour. Part C undergoes a drilling operation before being finally assembled with the output from assembly line 1. There are, in total, six drilling machines, but at present only three of them are operational. Each drilling machine drills part C at a rate of 80 parts per hour. In the final assembly, the output from assembly line 1 is assembled with the drilled part C. The final assembly line produces at a rate of 205 components per hour. At present, components are produced eight hours a day and five days a week. Management believes that if the need arises, it can add a second shift of eight hours for the assembly lines. The cost of assembly labor is 30 cents per part for…Mpho is an avid seamstress and want to sew and sell high quality, reusable designer face masks during the current Covid-19 pandemic. She will design and sew the masks herself and use her automatic embroidery machine to put her logo on each mask sold. With the help of her son, deliveries will be made all over Gauteng within 3 days of placing the order. Every mask will have a unique three-layer design with adjustable straps to ensure comfort and it. Mpho’s only expenseis the material needed to sew the masks and delivery costs. At this stage, Mpho’starget market is limited to Gauteng. Draw a diagram to illustrate the transformation process of Mpho’s new business. Be sure to include all relevant elements, headings and arrows to indicate the flow of products/ services. Question: 1. Draw a diagram to illustrate the transformation process of Mpho’s new business. Be sure to include all relevant elements, headings and arrows to indicate the flow of products/ services.
- Mpho is an avid seamstress and want to sew and sell high quality, reusable, designer face masks during the current Covid-19 pandemic. She will design and sew the masks herself and use her automatic embroidery machine to put her logo on each mask sold. With the help of her son, deliveries will be made all over Gauteng within 3 days of placing the order. Every mask will have a unique three-layer design with adjustable straps to ensure comfort and fit. Mpho’s only expense is the material needed to sew the masks and delivery costs. At this stage, Mpho’s target market is limited to Gauteng. Question: Create a diagram to illustrate the transformation process of Mpho’s new business. Be sure to include all relevant elements, headings and arrows to indicate the flowof products/ services. What should be in the diagram: outputs, inputs, feedback, transformation process and flow of product and service ect.LENILOVESBATO Co. produces various types of floor rugs with many different designs. They typically produce at least 200 rugs with a single machine setup. A cost incurred each time a new rug design is developed is called a(n) a. Unit-level cost b. Batch-level cost c. Product-level cost d. Facility-level costAtlanta Manufacturing Company produces products W, X, Y, and Z through a joint process. The joint costs amount to $250,000. Product Units Produced Sales Value at Split-Off Additional Costs of Processing Sales Value After Processing W 750 $10,000 $2,500 $15,000 X 1,500 $30,000 $3,000 $35,000 Y 1,000 $20,000 $4,000 $25,000 Z 1,500 $40,000 $6,000 $45,000 If W is processed further, profits of W will: 1) Increase by $2,500 2) Increase by $12,500 3) Decrease by $23,000 4) Increase by $5,000
- Sitka Industries uses a cost system that carries direct materials inventory at a standard cost. The controller has established these standards for one ladder (unit): StandardQuantity x StandardPrice = StandardCost Direct materials 3 pounds $4.50 per pound $13.50 Direct labor 2.00 hours 12.00 per hour 24.00 Total cost $37.50 Sitka Industries made 2,900 ladders in July and used 8,500 pounds of material to make these units. Sitka Industries bought 15,400 pounds of material in the current period. There was a $300 unfavorable direct materials price variance. Enter all amounts as positive numbers. A. How much in total did Sitka pay for the 15,400 pounds? B. What is the direct materials quantity variance? C. What is the total direct materials cost variance? D. What if 9,200 pounds were used to make these ladders, what would be the direct materials quantity variance? E. If there was a $340 favorable direct materials price variance, how much did Sitka pay…Assume that Product Z is made of two units of A and four units of B. A is made of three units of C and four of D. D is made of two units of E. B is made of three units of E. If 50 units of Z is required to make, then how many units of D do they need? Group of answer choices 250 400 300 150 550In a large microelectronics plant, the assembly cell for circuitboards has a demand for 200 units an hour. Two feeder cellssupply parts A and B to the assembly cell (one A and one Bfor each board). Standard containers that look like dividedtrays are used. A container will hold 20 As or 10 Bs. It takes10 minutes to fill up a container with As and 20 minutes tofill up a container with Bs. Transit time to the assembly cell is5 minutes for both A and B. No safety factor is used. Set up akanban control system for the assembly process.
- The following table provides a random sample of the unit values and annual demands of eight SKUs. SKU Code Unit Value Demand (units) A104 $0.02 D205 $2.60 X104 $4.80 U404 $2.50 L205 $0.36 S104 $0.84 X205 $4.35 L104 $0.23 4,500 30 25 2,500 1,040 380 70 250 Southern Markets Inc. is considering the use of ABC analysis to focus on the most critical SKUs in its inventory. a. Based on the percentage of dollar usage, which class should L205 belong to? Class b. Based on the percentage of dollar usage, which class should L104 belong to? ClassAn Electric Motor manufacturer has an annual production of 10,000 units. The electric motor ends are subcontracted to an aluminum-die casting company, in batch quantities of 2,500 units. The motor manufacturer purchases the die-cast tooling for $ 80,000, which requires refurbishing and adjustment in the Tool Room requiring 40 (PHC), prior to every Machine setup. The die-cast machine set up requires four hours, and the production cycle time is 0.85 minutes. The special aluminum alloy costs $1.20 per pound, and the Productive Hourly Cost (PHC) is $120 per hour Question a. Estimate the batch and unit cost. What is the percentage contribution of PHC, Tooling Cost and Material Cost to the Unit Cost ? Question b. Estimate the annual cost savings if the Electric Motor Manufacturer orders the motor ends in batches of 5000 units.Upton Enterprises produces a variety of switches. Below, you will find a bill-of-material file for their simplest switch: Part A. The number in the parentheses represents the number of units required for the upper level. LT stands for the lead time, measured in weeks.Assuming that Upton Enterprises has none of Switch A in inventory, and the inventory levels of Parts B, C, D, E, and F are also zero, how many weeks would it take to produce 100 units of Switch A? __________