preview

Unit 1106 Essay

Decent Essays

 Unit 1106- After a leak was reported in the unit below 1006 exploratory testing was conducted and found that the guest bathroom shower pan was leaking from the unit above. Owners were notified and Mr. Brown has executed permit. South American Tile has obtained a city permit. A possible start date of June 20, 2015 has been set. Owner and Contractor have confirmed start date. Contractor Package:  Unit TH7- Construction Design Group International submitted an Architectural Modification on June 16, 2015 with the following scope of work: Switching locations of adjacent window and door at the unit’s top level; Installation of an attached retractable awning at the roof level; Installation an attached retractable awning at the roof level; Demolition and replacement of roof level decking and waterproofing; After review A.S.A our engineering firm has suggest the package is requires board approval quoting our condo docs and issues with non-conformity of material. After review from the Board of Directors the package has been DIAPPROVED.  …show more content…

After Board review the package itself has been DISAPPROVED.  Unit 2008-Currently awaiting reply from A.S.A on their Architectural Modification Package.

Get Access