Effective capacity is:a) the capacity a firm expects to achieve, given the currentoperating constraints.b) the percentage of design capacity actually achieved.c) the percentage of capacity actually achieved.d) actual output.e) efficiency.
Q: An airline company must plan its fleet capacity and its long-term schedule of aircraft usage. For…
A: In this question, I would determine the needed capacity requirement in terms of customers per day,…
Q: In a capacity analysis, O a. Actual output is the maximum output rate of an operation O b. Actual…
A: The answer is as follows:
Q: If a plant has an effective capacity of 6,400 and an efficiency of 88%, then its actual (planned)…
A: Given data is Effective capacity = 6400 Efficeincy = 88%=0.88
Q: Why there is so much fuss about adopting the big picture approach to capacity planning in business…
A: * Introduction - Before diving deep and understanding how adopting a big picture strategy affects…
Q: . Outline different aspects to be considered when critical capacity decisions are made.
A: When considering capacity planning within a company, these key aspects should be considered-
Q: How you see the the company's excess capacity and how to utilize it throughout the year
A: Excess capacity is a state that occurs when the claim for the manufactured goods is reduced compared…
Q: In a service process such as the checkout counter in a discount store, a good target for capacity…
A: Answer given below:
Q: What cycle time would match capacity and demand if demand is 120 units a day, there are twoshifts of…
A:
Q: Which of the following is a long-term capacity expansion option: Select one: a. Rental or lease of…
A: The long-term capacity expansion involves growing an existing business in terms of capacity, that…
Q: Money Laundry has 22 washers and 34 dryers. All orders are first sent to wash and then to dry. It…
A: “Since you have posted a question with multiple sub-parts, we will solve the first three subparts…
Q: 1. Capacity refers to the productive capability of a system. What is the difference between design…
A: Since you have asked multiple questions, we will solve the first question for you. If you want any…
Q: A washing machine manufacturer works on 8 hours shift in a year (assume 2021 calendar) excluding…
A: Processing time refers to the time taken for the completion of an activity. Production capacity…
Q: When the units of demand are at its peak, the capacity will exceed the demand. * O False O True
A: Excess capacity is a situation where the demand for a product is less as compared to the amount of…
Q: An airline company must plan its fleet capacity and its longterm schedule of aircraft usage. For one…
A: Formula:
Q: The information we need when discussing the capacity of our facility is Select one: a. All the Given…
A: Production is the process of manufacturing products and services for selling purposes in the market.…
Q: Explain and expand these importance of capacity planning. 1. Capacity decisions often involve…
A: Capacity Planning is defined as a process of meeting the changing trends of demand of acompany's…
Q: a. What volume per month is required in order to break even? b. What profit would be realized on a…
A: Since you have posted a question with multiple sub-parts, we will solve the first three subparts for…
Q: A computer repair service has a design capacity of 80 repairs per day. Its effective capacity,…
A: Design capacity (DC) = 80 repairs per day Effective capacity (EC) = 64 repairs per day Output per…
Q: Determine the utilization and the efficiency for each of these situations: a. A loan processing…
A: Hence, the efficiency is 87.50% and the utilization is 70%.
Q: A company manufactures a product using two machine cells. Each cell has a design capacity of 250…
A:
Q: Determine the utilization and the efficiency for each of these situations:a. A loan processing…
A: Calculations: Formula:
Q: People are served in a process with two resources. The first resource has a capacity of 1.4 people…
A: Given, Total capacity of resource = Capacity * Number of workers Additional worker = 3+1 = 4 Total…
Q: Baby World Inc. has 31 operators and work 7 hours a day, 5 days a week. They specialize in making…
A: Incorporation: An incorporation is an organization entirely made for earning profits or for…
Q: Capacity planning are strategic decisions, because: a. Impact organizations ability to meet…
A: Capacity Planning are strategic decisions because :
Q: A seed company has a design capacity of 80 Metric Tonnes (MT) per day. Its effective capacity,…
A: Given Information: Design Capacity = 80 MT per day Effective Capacity = 64 MT per day Actual Output…
Q: 1. Determine the utilization and the efficiency for each of these situa a. A loan processing…
A: Calculations: Formula:
Q: Capacity cushion is to segment larger operations into smaller operating units with focused…
A: The capacity cushion is that the amount of spare capacity a business has expressed as a percentage…
Q: An average of 50 customers a day are currently served through a method. Observations made in recent…
A: Queuing theory is a mathematical model that determines the capacity of a system based on customer…
Q: An airline company must plan its fleet capacity and its long-term schedule of aircraft usage. For…
A: The manager is the person who is accountable for all the things that are happening in the…
Q: Given the following four capacity alternatives, find the best production method for every production…
A: Fixed costs are described as the costs that do not change or are independent of the number of…
Q: A firm’s operational ability (capacity) is very important. Therefore, capacity has been defined…
A: The following are the four reasons to determine the importance of the capacity decision for an…
Q: If a plant has an effective capacity of 6,400 and an efficiency of 88%, then its actual (planned)…
A: Effective capacity is the maximum measure of work that an association is capable of finishing in a…
Q: A firewood manufacturer is considering buying a hydraulic wood splitter which sells for $60,000. He…
A: A. Efficiency- Efficiency= produced productiontargeted production = 3550…
Q: Explain and expand these importance of capacity planning. 1. Capacity decisions have a real…
A: Capacity is the capability to produce the desired output per unit time by any organization. Capacity…
Q: In detail, Differentiate between design capacity, effective capacity and actual capacity
A: This question is related to the topic -production management and this topic fall under the…
Q: Your company just purchased a CNC Router and the engineering design specs clearly state that the…
A: Utilization rate is the ratio of actual capacity to the installed capacity.
Q: Discuss the importance of capacity planning in deciding on the number of police officers or…
A: Capacity planning in simpler words can be defined as workload management. It gives the information…
Q: A manufacturing shop is designed to operate most efficiently at an output of 550 units per day. In…
A: Capacity utilization rate is nothing but the process of calculating the percentage of the potential…
Q: Which among the following is a measure of the reserve capacity, a process has to handle in…
A: Capacity in layman's term is known as the total possible output that a firm or organization can…
Q: Can I get this explained
A: Since there are two questions and it is not clear which particular question you seek answer to we…
Q: A copy center in an office building prepares bound reports for two clients. The center makes…
A: The product development process includes all the steps required to take a product from idea to…
Q: An airline company must plan its fleet capacity and its long-term schedule of aircraft usage. For…
A: Given data Average number of customers per day = 70 Utilization rate of the equipment assigned =…
Q: The integral objective of capacity planning is to achieve a match between the long-term supply…
A: Capacity planning is defined as the process of matching an organization's capabilities to the…
Q: What volume (units) of output would the two alternatives yield the same profit?…
A: Given data For proposal A Fixed cost = $50000 Variable cost = $12 Revenue = $20 For proposal B…
Q: The process of establishing the output rate that can be achieved at a facility is capacity planning.…
A: Limit planning is the way toward deciding the production capacity needed by an association to…
Q: A manager faces peak (weekly) demand for one of her operations, but is not sure how long the peak…
A:
Q: In a service process such as the checkout counter in a discount store, what is a good target percent…
A: Companies must plan their capacities by considering the relationship between the quality of service…
Q: Capacity decisions should be made on the basis of:a) building sustained competitive advantage.b)…
A: A Small Introduction about Capacity Decision Capacity planning is a long-term decision that…
Effective capacity is: a) the capacity a firm expects to achieve, given the current operating constraints. b) the percentage of design capacity actually achieved. c) the percentage of capacity actually achieved. d) actual output. e) efficiency. |
Trending now
This is a popular solution!
Step by step
Solved in 3 steps
- a. what is the relationship between design capacity, system capacity, and actual output. b. how is a projected output within the boundaries of the design capacity and system capacity?A computer repair service has a design capacity of 80 repairs per day. Its effective capacity, however, is 64 repairs per day, and its actual output is 62 repairs per day. The manager would like to increase the number of repairs per day. Critically examine these factors and explain why you would recommend that the manager investigate: quality problems, absenteeism, or scheduling and balancing?A computer repair service has a design capacity of 80 repairs per day. Its effective capacity, however, is 64 repairs per day, and its actual output is 62 repairs per day. The manager would like to increase the number of repairs per day. Which of the following factors should the manager investigate: quality problems, absenteeism, or scheduling and balancing? Explain .
- Capacity planning are strategic decisions, because: a. Impact organizations ability to meet future demands b. Affect operating costs cDo not involve long-term commitment of resources d. Cannot affect competitiveness e. Alternatives a) and b) are both correctIIn a job shop, effective capacity is only 69 percent of design capacity, and actual output is 76 percent of effective output. What design capacity would be needed to achieve an actual output of 13 jobs per week? What is its effective capacity? a. The Design Capacity needed to achieve the required actual job outputs =Blank 1 (round to whole number) b. The Effective Capacity needed to achieve the required actual job outputs = Blank 2 (round to whole number) Blank 1 Blank 2 Add your answer Add your answerIn a job shop, effective capacity is only 43 percent of design capacity, and actual output is 71 percent of effective output. What design capacity would be needed to achieve an actual output of 11 jobs per week? What is its effective capacity?a. The Design Capacity needed to achieve the required actual job outputs = (round to whole number)b. The Effective Capacity needed to achieve the required actual job outputs = (round to whole number)
- 1. Capacity refers to the productive capability of a system. What is the difference between design capacity and effective capacity? 2. What are "Utilization" and "Efficiency" in a system? Provide working formulas for these values. 3. A classroom has a design capacity of 80 seats and an effective capacity of 65 seats. If 40 students attend a class held at that location. (NoteShaper #14 & #15) What is the utilization of the classroom? What is the efficiency of the classroom?Explanation of how the capacity analysis reacts to several processes running in simultaneously.Long term capacity decisions that confront managers in include all of the following except: workforce size additional land buildings capital equipment
- In a capacity analysis, O a. Actual output is the maximum output rate of an operation O b. Actual output does not exceed its effective сарacity O C. Effective capacity is lower than the actual output O d. Actual output exceeds effective capacityNeed human expert answer T/F Capacity planning involves determining the optimal mix of products and services to meet customer demand while maximizing profitability.Determine the utilization and the efficiency for each of these situations:a. A loan processing operation that processes an average of 7 loans per day. The operation has a design capacity of 10 loans per day and an effective capacity of 8 loans per day.b. A furnace repair team that services an average of four furnaces a day if the design capacity is six furnaces a day and the effective capacity is five furnaces a day.c. Would you say that systems that have higher efficiency ratios than other systems will always have higher utilization ratios than those other systems? Explain.