The electric utility rate for a facility during the months of May through October is 4.5 cents per kilowatt-hour for energy, $11.50 per kilowatt peak demand, and a $68.00 per month meter charge. During the August billing period the facility used 96,000 kw-hrs and set a peak demand of 624 kw during the time between 4:45 P.M. and 5:00 P.M. in the afternoon on August 15. Calculate the August eletric bill.
Want to see the full answer?
Check out a sample textbook solutionChapter 1 Solutions
Heating, Ventilation, and Air Conditioning: Analysis and Design
Additional Engineering Textbook Solutions
Applied Statics and Strength of Materials (6th Edition)
Introduction To Finite Element Analysis And Design
Automotive Technology: Principles, Diagnosis, and Service (5th Edition)
Degarmo's Materials And Processes In Manufacturing
INTERNATIONAL EDITION---Engineering Mechanics: Statics, 14th edition (SI unit)
Engineering Mechanics: Statics
- Demand factor is 0.75 on a Distributing Transformer that supplies a group of general power customers having a connected load of 186 kW. If the load factor for the group will average 45% and the energy sells at 3.5 cents per kWh, what will be the monthly (30-day) income from energy delivered through this transformer in Php/month; assuming an average motor efficiency to be 75%. (12) O 1,106.14 998.25 O 1,406.16 O 1,298.78 O 1,034.31arrow_forward15. A hydro-electric plant in Loboc, Bohol discharges 12300cfm and reduces the pressure from 2585mm Hg to 61.06in Hg. Determine the power in kW.arrow_forwarda. Determine the net power output. b. Determine the utilization factor.arrow_forward
- A.) A power plant is said to have a plant use factor of 48.5% and a plant capacity factor of 42.4%. How many hours did it operate during the whole year? B.)A central station has annual factors as follows; Load Factor 58.5%; Plant Capacity factor 40.9%; Plant Use Factor 45.2%. The reserve carried over and above the peak load is 8900kW. Find annual energy production in kW-hrarrow_forwardThe capital cost of a hydro-power station of 50 MW capacity is Rs 1,000 per kW. The annual depreciation charges are 10% of the capital cost. A royalty of Re 1 per kW per year and Re 0·01 per kWh generated is to be paid for using the river water for generation of power. The maximum demand on the power station is 40 MW and annual load factor is 60%. Annual cost of salaries, maintenance charges etc. is Rs 7, 00,000. If 20% of this expense is also chargeable as fixed charges, calculate the generation cost in two part form.arrow_forwardIf we wanted to supply all the electricity needs for New York City (NYC), with a popula- tion of about 10 million people, using photovoltaics technology, how much land area would we need? What other elements would be required for such an idea to work for NYC? How large of an investment would this involve, and how would the price of electricity in ¢ per kWeh have to increase in order to recover that investment in 10 years at an interest rate of 8%? For comparison, the average New Yorker paid 12¢/kWeh in 2002.arrow_forward
- Question 2. A household with electric resistance heating plans to switch from resistive heating to a ground source heat pump. Annual heat consumption of the house is 30 000 kWh. Investment cost of the heat pump is 21 000 €. Heat pumps COP is 4.0. How much are the annual savings compared to resistive heating after the change of the heating system (in kWh)? Average price of electricity is assumed to be 12 c/kWh. Round off your answer to one decimal digit and enter it without the unit.arrow_forward1d) A house has an electric resistance heater with an efficiency of 95%. The house is in a cold climate with heating requirement of 120 million BTU/year and no need for air conditioning in the summer. If a 14 costs $10700, what heat pump with an HSPF is the payback time in years (2 significant digits) for the heating savings compared to keeping the current resistance heater assuming electricity costs of $0.12/kWh?arrow_forwardA-Classify the hydro-power stations according to the height of the water, then calculate the height of the water needed to generate 2.86×10 Kw/h if the efficiency is 80% and the volume of water is 5x10⁹ m3, let that mass of Im of water is 1000 kg)arrow_forward
- ter 2) i Saved versity campus has 200 classrooms and 400 faculty offices. The classrooms are equipped with 12 fluorescent tubes, each uming 110 W, including the electricity used by the ballasts. The faculty offices, on average, have half as many tubes. The us is open 240 days a year. The classrooms and faculty offices are not occupied for an average of 4 h a day, but the lights are on. If the unit cost of electricity is $0.175/kWh, determine how much the campus will save a year if the lights in the classrooms aculty offices are turned off during unoccupied periods. lights in the classrooms and faculty offices are turned off during unoccupied periods, the campus will save $ per yr. 2 (Chaptearrow_forwardCalculate the use factor in decimal form for at least two decimal point of a power plant if the capacity factor is 35% and it operates 8000 hrs during the year?arrow_forward2) The energy consumed by a shower for 30 days is 22kwh. It is known that the resistance of the showerhead is 20 ohms and that its nominal current is 15A. So, what is the time in minutes that the shower was turned on during this period?arrow_forward
- Elements Of ElectromagneticsMechanical EngineeringISBN:9780190698614Author:Sadiku, Matthew N. O.Publisher:Oxford University PressMechanics of Materials (10th Edition)Mechanical EngineeringISBN:9780134319650Author:Russell C. HibbelerPublisher:PEARSONThermodynamics: An Engineering ApproachMechanical EngineeringISBN:9781259822674Author:Yunus A. Cengel Dr., Michael A. BolesPublisher:McGraw-Hill Education
- Control Systems EngineeringMechanical EngineeringISBN:9781118170519Author:Norman S. NisePublisher:WILEYMechanics of Materials (MindTap Course List)Mechanical EngineeringISBN:9781337093347Author:Barry J. Goodno, James M. GerePublisher:Cengage LearningEngineering Mechanics: StaticsMechanical EngineeringISBN:9781118807330Author:James L. Meriam, L. G. Kraige, J. N. BoltonPublisher:WILEY