Practical Management Science
Practical Management Science
6th Edition
ISBN: 9781337406659
Author: WINSTON, Wayne L.
Publisher: Cengage,
bartleby

Concept explainers

Question
Book Icon
Chapter 12.5, Problem 29P
Summary Introduction

To determine: The machine that the bank should rent.

Introduction: In order to predict the waiting time and length of the queue, queueing model will be framed. Queueing theory is the mathematical model that can be used for the decision-making process regarding the resources required to provide a service.

Blurred answer
Students have asked these similar questions
In the production shop of a company, the breakdown of the machines is found to be Poisson distributed with an average rate of 3 machines per hour. Breakdown time at one machine cost 400 birr per hour to the company. There are two choices before the company for hiring the repairmen. One of the repairmen is slow but cheap, the other is fast but expensive. The slow cheap repairman demands 200 birr per hour and will repair the broken down machines exponentially at the rate of 5 per hour. The fast expensive man demands 300 birr per hour and will repair machines exponentially at an average rate of 6 per hour. Which repairman should be hired?
You are considering to invest in a franchise for a coffee shop in your neighborhood. To understand the revenue potential, you decide to visit a coffee shop from the same chain next to your neighborhood. In the next few months, you visit this coffee shop at random times between 6am and 9am. You observe that the line (queue) averages about 9 customers and it takes about 3 minutes to get in and out of the coffee shop. Assuming this is a typical experience and each customer spends about $5 per visit, what is the revenue potential per hour of this coffee shop? Hint: Calculate the number of customers arriving per minute (i.e., λ). Convert this to customers per hour. Then, calculate the revenue from these customers (each customer spends about $5, on average)
Toolco operates a machine shop with 22 machines. On the average, a machine breaks down every 2 hours. It takes an average of 12 minutes to complete a repair. When a machine breaks down, one of four repairpersons is called upon to do the repair. Both the time between breakdowns and the repair time are exponential. Toolco is interested in analyzing this situation and knowing the number of repairpersons needed to keep the shop running "smoothly." A = 12 = 0.5 breaks down per hour μ = 60/12 = 5 breaks down per hour System limit = K = 22 machines Source limit= K = 22 machines R = 1, 2, 3, 4. (M/M/R: GD/ K /K),
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,