Explanation of Solution
Basic solutions not being optimal
- Any other basic solution will have s1 and/or s2 as a basic variable.
- Since no right hand side is 0, if s1 or s2 is pivoted in it will be positive...
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
The tableau is not optimal for either maximization or a minimization problem. Thus, when a nonbasic variable enters the solution it can either increase or decrease Z or leave it unchanged, depending on the parameters of the entering nonbasic variable.
Basic
Z 0 -5 0 4 -1 -10 0 0 598
0 3 0 -2 -3 -1 5 1 12
0 1 1 3 1 0 3 0 6
1 -1 0 0 6 -4 0 0 0
Categorize the variables as basic and nonbasic and provide the
current values of all the variables. AP [8]
Assuming that the problem is of the maximization type, identify the nonbasic variables that have the potential to improve the value of If each such variable enters the basic solution, determine the associated leaving…
1. Consider an instance of the Knapsack Problem without repetitions with 4 items, having
weights and values as follows. The weights (in pounds) are w1=2, w2 =7, w3 =10, w4 =12.
The dollar values of these items are respectively v1 = 12, v2 = 28, v3 = 30, v4 = 5. The
capacity of the knapsack is 12.
(a) Find the optimal solution for Fractional Knapsack.
(b) Find the optimal solution for 0-1 Knapsack.
In an optimal A* search,
a- describe the problem of a heuristic function that overestimates the cost. How
does it effect the solution? Give an example.
b-is a heuristic method that underestimates the cost admissible? How does it effect
the solution? Give an example
Chapter 4 Solutions
Introduction to mathematical programming
Ch. 4.1 - Prob. 1PCh. 4.1 - Prob. 2PCh. 4.1 - Prob. 3PCh. 4.4 - Prob. 1PCh. 4.4 - Prob. 2PCh. 4.4 - Prob. 3PCh. 4.4 - Prob. 4PCh. 4.4 - Prob. 5PCh. 4.4 - Prob. 6PCh. 4.4 - Prob. 7P
Ch. 4.5 - Prob. 1PCh. 4.5 - Prob. 2PCh. 4.5 - Prob. 3PCh. 4.5 - Prob. 4PCh. 4.5 - Prob. 5PCh. 4.5 - Prob. 6PCh. 4.5 - Prob. 7PCh. 4.6 - Prob. 1PCh. 4.6 - Prob. 2PCh. 4.6 - Prob. 3PCh. 4.6 - Prob. 4PCh. 4.7 - Prob. 1PCh. 4.7 - Prob. 2PCh. 4.7 - Prob. 3PCh. 4.7 - Prob. 4PCh. 4.7 - Prob. 5PCh. 4.7 - Prob. 6PCh. 4.7 - Prob. 7PCh. 4.7 - Prob. 8PCh. 4.7 - Prob. 9PCh. 4.8 - Prob. 1PCh. 4.8 - Prob. 2PCh. 4.8 - Prob. 3PCh. 4.8 - Prob. 4PCh. 4.8 - Prob. 5PCh. 4.8 - Prob. 6PCh. 4.10 - Prob. 1PCh. 4.10 - Prob. 2PCh. 4.10 - Prob. 3PCh. 4.10 - Prob. 4PCh. 4.10 - Prob. 5PCh. 4.11 - Prob. 1PCh. 4.11 - Prob. 2PCh. 4.11 - Prob. 3PCh. 4.11 - Prob. 4PCh. 4.11 - Prob. 5PCh. 4.11 - Prob. 6PCh. 4.12 - Prob. 1PCh. 4.12 - Prob. 2PCh. 4.12 - Prob. 3PCh. 4.12 - Prob. 4PCh. 4.12 - Prob. 5PCh. 4.12 - Prob. 6PCh. 4.13 - Prob. 2PCh. 4.14 - Prob. 1PCh. 4.14 - Prob. 2PCh. 4.14 - Prob. 3PCh. 4.14 - Prob. 4PCh. 4.14 - Prob. 5PCh. 4.14 - Prob. 6PCh. 4.14 - Prob. 7PCh. 4.16 - Prob. 1PCh. 4.16 - Prob. 2PCh. 4.16 - Prob. 3PCh. 4.16 - Prob. 5PCh. 4.16 - Prob. 7PCh. 4.16 - Prob. 8PCh. 4.16 - Prob. 9PCh. 4.16 - Prob. 10PCh. 4.16 - Prob. 11PCh. 4.16 - Prob. 12PCh. 4.16 - Prob. 13PCh. 4.16 - Prob. 14PCh. 4.17 - Prob. 1PCh. 4.17 - Prob. 2PCh. 4.17 - Prob. 3PCh. 4.17 - Prob. 4PCh. 4.17 - Prob. 5PCh. 4.17 - Prob. 7PCh. 4.17 - Prob. 8PCh. 4 - Prob. 1RPCh. 4 - Prob. 2RPCh. 4 - Prob. 3RPCh. 4 - Prob. 4RPCh. 4 - Prob. 5RPCh. 4 - Prob. 6RPCh. 4 - Prob. 7RPCh. 4 - Prob. 8RPCh. 4 - Prob. 9RPCh. 4 - Prob. 10RPCh. 4 - Prob. 12RPCh. 4 - Prob. 13RPCh. 4 - Prob. 14RPCh. 4 - Prob. 16RPCh. 4 - Prob. 17RPCh. 4 - Prob. 18RPCh. 4 - Prob. 19RPCh. 4 - Prob. 20RPCh. 4 - Prob. 21RPCh. 4 - Prob. 22RPCh. 4 - Prob. 23RPCh. 4 - Prob. 24RPCh. 4 - Prob. 26RPCh. 4 - Prob. 27RPCh. 4 - Prob. 28RP
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, computer-science and related others by exploring similar questions and additional content below.Similar questions
- Isn't the actual optimal S->B->G. If yes, then how are the assumed heuristics valid?arrow_forwardConsider the following 0-1 knapsack problem, the items, their weights and their profits appear in table below. If the knapsack has capacity 11 select the items that appear in the solution? i.e. select answers 1, 2,and 3 if those are the items in the optimal knapsack. Item 2 3 5 6 Weight 1 2 3 4 5 6 Profit 10 13 15 U item 1 U item 2 U item 3 U item 4 U item 5 U item 6 O O O O O Oarrow_forwardSuppose the risk index for the stock fund (the value of ) increases from its current value of 8 to 12. How does the optimal solution change, if at all? Suppose the risk index for the money market fund (the value of ) increases from its current value of 3 to 3.5. How does the optimal solution change, if at all? Suppose increases to 12 and increases to 3.5. How does the optimal solution change, if at all?arrow_forward
- A person is cutting a long board of wood into different length of pieces . Each cutting has fixed width 2 cm lengths. Given that each cutting with different length has a different price, Now, we are required to help this person to find the optimal cuts in order to increase his income. Consider following example showing different cut’s lengths and their equivalent prices. Input: board length = 4 Length [ ] = [1, 2, 3, 4, 5, 6, 7, 8] Price [ ] = [2, 6, 8, 10, 14, 17, 19, 20] Output: Best cut is two pieces of length 2 each to gain revenue of 6 + 6 = 12 [Explanation: the possible cuts and profit of each is as follows: As noted the best cut is two pieces of length 2 each to gain revenue of 6 + 6 = 12arrow_forwardQ 2: f(n) = g(n) + h(n). Discuss which thing should be optimal, underestimated, overestimated, admissible or non-admissible. What will happen if you make it monotonic? Give the example case to preserve its admissibility?arrow_forwardIn regards of the problem:max cTx subject to Ax = b, with an optimal solution of value v. Suppose the problem min cT x, subject to Ax = b have great with the same value, v. It can be concluded that there is a singlegood point for both? How is the feasible region geometrically?arrow_forward
- A construction company has four large bulldozers located at four different garages. The bulldozers are to be moved to four different construction sites. The distances in miles between the bulldozers and the construction sites are given below. Bulldozer/ A B C D Site Students 1 90 75 75 80 solve it 2 35 85 55 65 yourself 3 125 95 90 105 4 45 110 95 115 How should the bulldozers be moved to the construction sites in order to minimize the total distance traveled?arrow_forwardConsider the following initial simplex tableau below, for a maximization LP problem. Interpret, deduce and construct the LP model for this set up. Basic Z 1 -1 -3 0 0 0 0 0 0 3 2 1 0 0 0 10 0 4 1 0 1 0 0 8 0 5 6 0 0 1 0 20 0 2 7 0 0 0 1 30arrow_forwardThe shaded region in the given figure above illustrates an unbounded feasible region. Which of the following is true? I. The maximum value for the objective function does not exist in an unbounded feasible region. II. If the objective function is Min Z=x+y, then it's maximum is 25 at (25,0). III. If the objective function is Max Z=-x+2y, then it's minimum is O at (25,0). IV. Unbounded feasible regions have either maximum or minimum value. 024 10 (25 0) -20 -10 10 O A. I O B. II O C.I and II O D. II and IVarrow_forward
- How can you prove that the bound of 2 for the Min Spanning Tree heuristic is tight? what is an example where the cost of the Min Spanning Tree heuristic is two times the optimal cost? Also how do you prove that the bound of 3/2 for the Christofides’ heuristic is tight? what is an example where the cost of the Christofides’ heuristic is 3/2 times the optimal cost? Consider the bound at the limit of infinity nodes.arrow_forwardSolve the following graphically: Max z = 3x1 + 4x2 subject to x1 + 2x2 ≤ 16 2x1 + 3x2 ≤ 18 x1 ≥ 2 x2 ≤ 10 x1, x2 ≥ 0 What are the optimal values of x1, x2, and z? Group of answer choices x1 = 93, x2 = 0, z = 48 x1 = 19, x2 = 0, z = 32 x1 = 10, x2 = 0, z = 27 x1 = 9, x2 = 0, z = 27 x1 = 9, x2 = 3, z = 30 x1 = 12, x2 = 6, z = 42arrow_forward
arrow_back_ios
arrow_forward_ios
Recommended textbooks for you
- Operations Research : Applications and AlgorithmsComputer ScienceISBN:9780534380588Author:Wayne L. WinstonPublisher:Brooks Cole
Operations Research : Applications and Algorithms
Computer Science
ISBN:9780534380588
Author:Wayne L. Winston
Publisher:Brooks Cole