Mylab Operations Management With Pearson Etext -- Access Card -- For Operations Management: Sustainability And Supply Chain Management (13th Edition)
13th Edition
ISBN: 9780135225899
Author: Jay Heizer, Barry Render, Chuck Munson
Publisher: PEARSON
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter B, Problem 8P
Summary Introduction
To determine: The best profitable mix of robots using linear programming.
Introduction:
Linear programming:
It is a linear optimization technique followed to develop the best outcome for the linear programming problem. The outcome might be to maximize profit, minimize cost, or to determine the optimal product mix. The outcome will take the constraints present in achieving the solution into consideration.
Expert Solution & Answer
Trending nowThis is a popular solution!
Students have asked these similar questions
There is an upstream Picking department that feeds two downstream
Packing departments: Pack Singles and Pack Multis. Those Packing departments feed to a Shipping department that loads the outgoing trucks. 40% of your Pick volume goes to Pack Singles and has a packing rate of 104 units per labor hour (uph). 60% of the Pick volume goes to Pack Multis and has a pack rate of 215 units per labor hour. Your pickers pick both Single and Multi items throughout the day at an overall average rate of 114 units per labor hour. All units that are packed in both processes go through the Ship process at a rate of 570 units per hour. You have 102 people today for all 4 departments and you absolutely must pack 47,880 units in Pack Multis Items to meet a customer promise metric. How do you allocate labor to balance the flow in your department if you work a 10 hour shift? Do not assume breaks or lunches in your answer. Redirect 1: You now need to process all of the Pack Singles Volume in the first 5…
Richard has been a highly regarded employee of the Brier Corporation for almost 20 years. Her loyalty to the company is reflected in her dedication to her job as general accounting clerk from which she has not taken a vacation in almost 12 years. Because of her dedication and long tenure, she has acquired many related responsibilities, which has allowed the Brier Corp to reduce its work force through attrition, control salary expenses and become more efficient and competitive. The following describes Richard’s responsibilities.
Richard receives copies of credit sales orders from the sales department. From these documents she accesses the AR subsidiary ledger from her office computer and records the AR. She then records the sale in the sales journal and posts the transactions to the general ledger accounts. Cash receipts in payment of customer AR come directly to her office. She records the cash receipts in the GL cash and AR accounts and updates the AR subsidiary ledger. She then…
A recurring maintenance job in a factory is being done by a three-man crew. Due to the nature of the job and space limitations, it was observed that two of the men were idle 37% of the time; one of the men was also idle an additional of the time, and at any given time only one man was required. The men were each paid P24.00 per hour. Each time the job was performed a set of tools and equipment with a value equivalent to P36.00 per hour was used. If the three-men crew could complete the work in 5 hours, which crew size would be the most economical
Chapter B Solutions
Mylab Operations Management With Pearson Etext -- Access Card -- For Operations Management: Sustainability And Supply Chain Management (13th Edition)
Ch. B - Prob. 1DQCh. B - Prob. 2DQCh. B - Prob. 3DQCh. B - Prob. 4DQCh. B - Prob. 5DQCh. B - Prob. 6DQCh. B - Prob. 7DQCh. B - Prob. 8DQCh. B - Prob. 9DQCh. B - Prob. 10DQ
Ch. B - Prob. 11DQCh. B - Where a constraint crosses the vertical or...Ch. B - Prob. 13DQCh. B - Prob. 2PCh. B - Prob. 3PCh. B - Prob. 25PCh. B - B.4. Consider the following linear programming...Ch. B - Prob. 26PCh. B - Prob. 27PCh. B - Prob. 5PCh. B - Prob. 6PCh. B - Green Vehicle Inc. manufactures electric cars and...Ch. B - Prob. 8PCh. B - Prob. 28PCh. B - Prob. 29PCh. B - The LP relationships that follow were formulated...Ch. B - Prob. 22PCh. B - Prob. 9PCh. B - Prob. 34PCh. B - Prob. 35PCh. B - Prob. 36PCh. B - Prob. 10PCh. B - Prob. 11PCh. B - Prob. 12PCh. B - Prob. 30PCh. B - Prob. 37PCh. B - How many corner points are there in the feasible...Ch. B - Prob. 13PCh. B - Prob. 38PCh. B - Prob. 40PCh. B - Prob. 15PCh. B - Prob. 16PCh. B - Prob. 17PCh. B - Prob. 18PCh. B - Prob. 19PCh. B - Prob. 20PCh. B - Prob. 33PCh. B - Quain Lawn and Garden, Inc Bill and Jeanne Quain...Ch. B - Quain Lawn and Garden, Inc Bill and Jeanne Quain...
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- During an eight-hour shift, 750 non-defective parts are desired as a result of a manufacturing operation. The default operation time is 15 minutes. As the operators of machine are inexperienced, the actual time they take to perform the operation is 20 minutes, and, on average, a fifth of the parts that start to be manufactured are lost. Assuming that each one of the machines used in this operation will not be available for one hour in each shift, determine the number of machines needed.arrow_forwardA company makes two products (A and B). Each product requires time on two machines 1 and 2. the specifications for each product are as follows Product A Product B Processing time on machine 1 (hrs/unit) Processing time on machine 2 (hrs/unit) Material and labor cost (Sh./ unit) Selling price (Sh./ unit) Maximum possible sale (units) 2 1 2 14 15 16 18 130 150 The amount of time available on machine 1 is 360 hrs and on machine 2 is 260 hrs. Using simplex method determine the number of product A and B, which should be sold in order to maximize total contribution for the company.arrow_forwardRollmore, a non-union manufacturing company decides it needs input on improving its work processes and procedures and decides to create employee committees to provide general feedback about things such as work rules and organizational policies and practices in hopes of improving efficiency. Rollmore asks ten employees to serve on such committees. Rollmore asks these employees to bring to their meetings, which include management representatives, concerns and ideas from their coworkers. Rollmore schedules these committees to meet once a month for two hours and provides lunch and a conference room for the participants. Are these employee committees legal or illegal? Why or why not?arrow_forward
- A diabetic patient needs at least 40 units of Vit. A, at least 30 units of Vit. C, and atleast 30 units of Vit. E each day. Each brand X multivitamin capsule contains 4 units of Vit. A, 6 units of Vit. C, and 2 units of Vit. E; each brand Y capsule contains 5 units of Vit.A, 3 units of Vit.C, and 5 units of Vit. E. If each brand X capsule costs P6.00 and eachbrand Y capsule costs P9.00, how many capsules should the patient take each day tominimize the costs? Solve using graphical method. Show complete solution.arrow_forwardCompany ZWZ manufactures three products in a serial system; Product XA is manufactured in Stage 1, Product XB in Stage 2, and XC in Stage 3. Product XB has a sales potential in the market; hence, some of it can be sold at the end of Stage 2, and the remaining can be moved to Stage 3. The third stage produces Product XC, and then delivers it to customers. Two units of Product XA produced in Stage 1 are required for each unit of Product XB in Stage 2. In addition, four units of Product XB produced in Stage 2 are required for each unit of Product XC in Stage 3. Stage 1 can only use regular time; however, Stage 2 has the options of using regular time and overtime in manufacturing. On the other hand, Stage 3 has only one alternative, which is subcontracting. The pertinent data are provided below: Stage 2 Stage 1 11 No overtime No subcontracting No sales 0.07 Unit regular time cost (TL) Unit overtime cost (TL) Unit subcontracting cost (TL) Unit selling price (TL) Unit processing time (hrs)…arrow_forwardNewTel is a telephone company with a policy of filling positions internally through promotions, rather than hiring from outside. Until recently, the company had a strong engineering focus and tended to promote people to senior executive positions from the engineering areas. Consequently, almost all of the company's 14 senior executives joined the company over 20 years ago as junior engineers. There is increasing pressure on NewTel to become more market and service oriented. As a result, four people were hired last year from firms to fill new senior executive positions in marketing and service departments. The external hires were necessary because current employees were not sufficiently qualified. Now, there are signs of tension among senior executives, particularly during budget deliberations where there is limited discretionary spending on new corporate activities. The four new hires have been thwarted in their attempts to have the company invest more in marketing and customer…arrow_forward
- A diabetic patient needs at least 40 units of Vit. A, at least 30 units of Vit. C, and at least 40 units 30 units of Vit. E each day. Each brand X multivitamin capsule contains 4 units of Vit. A, 6 units of Vit. C, and 2 units of Vit. E; each brand Y capsule contains 5 units of Vit. A, 3 units of Vit.C, and 5 units of Vit. E. If each brand X capsule costs P6.00 and each brand Y capsule costs P9.00, how many capsules should the patient take each day to minimize the costs?arrow_forward4. The seven-person maintenance function at a hospital performs both preventive and corrective maintenance on hundreds of items each month. All the workers are scheduled for 40 hours per week and there are four weeks in a month. It is the goal of the maintenance department to achieve 90% utilization with a mix of two-thirds preventive maintenance and one-third corrective maintenance. How many hours each monthOre spent performing preventive maintenance if they achieve their 90% utilization and correct/preventive mix targets? 6. Focus ר DELLarrow_forwardJOHNSON’S RULE Five specialty jobs at a La Crosse, Wisconsin, tool and die shop must be processed through two workcenters (drill press and lathe). The time for processing each job follows:Work (processing) Time for Jobs (hours)JOBWORK CENTER 1(DRILL PRESS) WORK CENTER 2(LATHE)A5 2B3 6C8 4D 10 7E 7 12arrow_forward
- An industrial engineer has designed two alternative methods for accomplishing a production job. Both methods involve the acquisition of the same working place and other capital equipment to be used for this job only. Method A calls for a crew consisting of three men each costing Php30/hr. This method will result in the production of 10 units per hour of which two will be reject. Method B calls for a crew of two men each costing Php35/hr and should result in the production of eight units per hour of which one will be reject. The cost of the direct material lost in each reject is Php20. If a certain total number of units is to be produced find which method is economical?arrow_forwardDigital Controis, Inc. (DCI), manufactures two models of a radar gun used by police to monitor the speed of automobiles. Model A has an accuracy of plus or minus 1 mile per hour, whereas the smaller model B has an accuracy of plus or minus 3 miles per hour. For the next week, the company has orders for 100 units of model A and 150 units of model B. Although DCI purchases all the electronic components used in both models, the plastic cases for both models are manufactured at a DCI plant in Newark, New Jersey. Each model A case requires 4 minutes of injection-molding time and 6 minutes of assembly time. Each model B case requires 3 minutes of injection-molding time and 8 minutes of assembly time. For next week, the Newark plant has 600 minutes of injection-molding time avallable and 1,080 minutes of assembly time availab The manufacturing cost is $10 per case for model A and $6 per case for model B. Depending upon demand and the time avalable at the Newark plant, DCI occasionally…arrow_forwardTwo vital stages in a production process are assembly I and assembly II. The unit load for the assembly I stage is 7.0 ( 50% higher for high skill) minutes, while it is 10.0 (30 % higher for high skill) minutes for assembly II. There are 7 employees working in assembly I and 8 employees working in assembly II. 65% of low skill labor and 35% of high skill labor are required at both stages. . On average 18% of the operating time is wasted, what's the theoretical unit load for Assembly II? answer is 9.06 please explainarrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,