a)
To determine: The approximate time needed to plan for a restaurant.
Introduction:
Capacity planning:
It is the method of planning the required production output, based on the requirement or the demand that is predicted.
a)
Explanation of Solution
It takes approximately 1 year to plan for a restaurant, as the complex and size is limited. The facility of the restaurant can be leased.
b)
To determine: The approximate time needed to plan for a hospital.
Introduction:
Capacity planning:
It is the method of planning the required production output, based on the requirement or the demand that is predicted.
b)
Explanation of Solution
It takes approximately 2 years to plan for a hospital, as the design is complex.
c)
To determine: The approximate time needed to plan for a oil-refinery.
Introduction:
Capacity planning:
It is the method of planning the required production output, based on the requirement or the demand that is predicted.
c)
Explanation of Solution
It takes 5 years to plan for an oil-refinery, as the government regulation and design is complex. Also, it has a great deal of land.
d)
To determine: The approximate time needed to plan for a toy factory.
Introduction:
Capacity planning:
It is the method of planning the required production output, based on the requirement or the demand that is predicted.
d)
Explanation of Solution
It takes one or two years to plan for a toy factory. If the building is leased, the required time will be less. The time required is based on the size of the building.
e)
To determine: The approximate time needed to plan for an electric power plant.
Introduction:
Capacity planning:
It is the method of planning the required production output, based on the requirement or the demand that is predicted.
e)
Explanation of Solution
It takes five years to plan for an electric power plant, as the government regulation and the design is complex. For the electric power plant, the public approval is required, which would slow down the process.
f)
To determine: The approximate time needed to plan for a public school.
Introduction:
Capacity planning:
It is the method of planning the required production output, based on the requirement or the demand that is predicted.
f)
Explanation of Solution
It takes few years to plan for the public school, as the general public is involved in the process.
g)
To determine: The approximate time needed to plan for a private school.
Introduction:
Capacity planning:
It is the method of planning the required production output, based on the requirement or the demand that is predicted.
g)
Explanation of Solution
It takes a year to plan for a private school, as the design is simple.
Want to see more full solutions like this?
Chapter 11 Solutions
OPERATIONS MANAGEMENT IN THE SUPPLY CHAIN: DECISIONS & CASES (Mcgraw-hill Series Operations and Decision Sciences)
- I want an actual operation and maintenance plan of a sports stadium. I do not want guidelines in developing a plan. Can I be provided with an actual plan?arrow_forwardWhy is Ergonomics important in a food production facility?arrow_forwardLine balancing As the Operations Manager of Shane Manufacturing Ltd., you are given the task to balance the assembly line that is used to produce a special type of toy. a. Develop your own scenario (quantitative example) of this line balancing problem. Include all relevant information. b. Draw the precedence diagram for the problem that you set up in part “a" above. c. Use the example that you set up to demonstrate how you will balance the line. d. Calculate the efficiency of the line.arrow_forward
- Cortez Manufacturing intends to increase capacity by overcoming a bottleneck operation by adding new equipment. Two vendors have presented proposals. The fixed costs are $50,000 for proposal A and $75,000 for proposal B. In addition to the proposed fixed costs from the two ve management at Cortez anticipates that they will have to spend $8,000 for installations be completed. The variable cost is $12.00 for A and $11.00 for B. The revenue generated by each unit is $24.00. a) The break-even point in dollars for the proposal by Vendor A = $ (round your response to the nearest whole number). b) The break-even point in dollars for the proposal by Vendor B = $| (round your response to the nearest whole number).arrow_forwardWhile listing the pros and cons for each facility alternative, bias can easily be introduced True Falsearrow_forward31 please help me please!A company has a factory that is designed so that it is most efficient (average unit cost is minimized) when producing 19,200 units output each month. However, it has an absolute maximum output capability of 23,000 units per month, and can produce as little 7,000 units per month without corporate headquarters shifting production to another plant. If the factory produces 13,280 units ir October, what is the capacity utilization rate in October for this factory? Note: Round your answer to 1 decimal place.arrow_forward
- Explain what is meant by concept of facility location and layout decisions in business operations?arrow_forwardPlease answer the question as quickly as possible A toy company has developed two new toys for possible inclusion in its product line for the upcoming Christmas season. Setting up the production facilities to begin production would cost $50,000 for toy 1 and $80,000 for toy 2. Once these costs are covered, the toys would generate a unit profit of $10 for toy 1 and $15 for toy 2. The company has two factories that are capable of producing these toys. However, to avoid doubling the start-up costs, just one factory would be used, where the choice would be based on maximizing profit. For administrative reasons, the same factory would be used for both new toys if both are produced. Toy 1 can be produced at the rate of 50 per hour in factory 1 and 40 per hour in factory 2. Toy 2 can be produced at the rate of 40 per hour in factory 1 and 25 per hour in factory 2. Factories 1 and 2, respectively, have 500 hours and 700 hours of production time available before Christmas that could…arrow_forwardA likely office location for a group of offices consisting of a Pediatric Dentist, and Orthodontist and a Pediatrician would be: A. a high rise office building in an urban setting. B. a flexible warehouse space. C. All of these are correct. D. a neighborhood office complex.arrow_forward
- Problem 5-1 (Algo) Determine the utilization and efficiency for each of the following situations. a. A loan processing operation that processes an average of 7 loans per day. The operation has a design capacity of 13 loans per day and an effective capacity of 8 loans per day. (Round your answer to 1 decimal place.) b. A furnace repair team that services an average of 2 furnaces a day if the design capacity is 10 furnaces a day and the effective capacity is 6 furnaces a day. (Round your answer to 1 decimal place.) c. Would you say that systems that have higher efficiency ratios than other systems will always have higher utilization ratios than those other systems?arrow_forwardWhat is the ideal location and layout of a hospital pharmacy? Explain.arrow_forwardAs the Operations Manager of Shane Manufacturing Ltd., you are given the task to balance the assembly line that is used to produce a special type of toy. a. Develop your own scenario (quantitative example) of this line balancing problem. Include all relevant information b. Draw the precedence diagram for the problem that you set up in part “a” above. c. Use the example that you set up to demonstrate how you will balance the line.arrow_forward
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,