Chapter 9.10, Problem 27P

a.

Summary Introduction

Interpretation: The positional weights of given activities have to be calculated.

Concept Introduction:

Positional weight: Positional weight is the sum of weight of that particular position and the rest of the task weights succeeding in the task list.

b.

Summary Introduction

Interpretation: The minimum number of stations achieved when the cycle time is 30 has to be computed.

Concept Introduction:

Minimum cycle time: It is supposed to be the longest time taken to complete a series of tasks involved in production of a product.

c.

Summary Introduction

Interpretation: The status of number of stations to be derived when the cycle time is lower.

Concept Introduction:

Minimum cycle time: It is supposed to be the longest time taken to complete a series of tasks involved in production of a product.

Blurred answer
Students have asked these similar questions
The trim line at PW is a small subassembly line that, alongwith other such lines, feeds int1, o the final chassis line.The entire assembly line, which consists of more than 900workstations, is to make PW’s new E cars. The trim line itselfinvolves only 13 work elements and must handle 20 cars perhour. Work-element data are as follows:Work Element Time (Sec) Immediate Predecessor(s)A 2.4 NoneB 0.5 NoneC 2.1 NoneD 1.8 CE 1.1 BF 0.9 A G 2 AH 0.7 FI 0.7 DJ 1.8 H, EK 1.3 JL 1.9 GM 1.1 L, I, Ka. Draw a precedence diagram.b. What cycle time (in minutes) results in the desired outputrate?c. What is the theoretical minimum number of stations?d. Use the longest work element decision rule to balance theline and calculate the efficiency of your solution.e. Use the most followers work element decision rule tobalance the line and calculate the efficiency of yoursolution.
A production process at Kenneth Day Manufacturing is shown in the figure below. The drilling operation occurs separately from, and simultaneously with, the sawing and sanding, which are independent sequential operations. A product needs to go through only one of the three assembly operations (the operations are in parallel). Q 2.1 units/hr Sawing 5 units/hr Sanding Drilling 5 units/hr Welding 2.5 units/hr a) Sawing is the bottleneck. b) The bottleneck time is 28.57 minutes per unit (round your response to two decimal places). c) The throughput time of the overall system is minutes (round your response to two decimal places). Assembly 0.8 units/hr Assembly 0.8 units/hr Assembly 0.8 units/hr
Manufacturing Company uses FIFO method of accumulating costs in a two-department process. Materials are introduced at the inception of the process except for a special material which is added in department 2 at 60% completion as to overhead. Inspection is done at the end of the process in both departments. Production data for Department 2 are given below: In process, beginning, (80% labor, 70% overhead)2,000 Transferred in 14,900 In process, ending (40% labor, 20% overhead) 3,000 Normal spoilage 200 Abnormal spoilage (found at 30% completion as to laborand 15% as to overhead due to internal failure) 400 Cost data for the month:In process beginning:Transferred in 15,020 Special materials 1,900 Direct labor 4,388 Overhead 11,044 Current costs:Transferred in 137,080 Special materials 14,030 Direct labor 46,000 Overhead 113,564   The cost of units transferred to finished goods is?The cost of spoilage charged to revenue is?
Knowledge Booster
Background pattern image
Operations Management
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.
Similar questions
SEE MORE QUESTIONS
Recommended textbooks for you
Text book image
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,
Process selection and facility layout; Author: Dr. Bharatendra Rai;https://www.youtube.com/watch?v=wjxS79880MM;License: Standard YouTube License, CC-BY