Question
Chapter 5, Problem 11P
Summary Introduction
Interpretation: Type of capacity assumes ideal operating conditions.
Concept Introduction:
Design capacity represents the theoretical capacity of a system. The design capacity is the maximum output that the system was built to produce. It is the capacity of the system that works under perfect working conditions.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
Flow and waiting time through a process are affected by seasonal fluctuation in demand. What does this mean? If a corporation wants to limit the impact of this fluctuation, what steps can it take?
Knott’s Industries manufactures standard and super premium backyard swing sets. Currently it has four identical swing-set-making machines, which are operated 250 days per year and 8 hours each day. A capacity cushion of 20 percent is desired. The following information is also known:
Standard Model
Super PremiumModel
Annual Demand
Standard Processing Time
Average Lot Size
Standard Setup Time per Lot
20,000
7 min
50
30 min
10,000
20 min
30
45 min
a. Does Knott’s have sufficient capacity to meet annual demand?b. If Knott’s was able to reduce the setup time for the Super Premium Model from 45 minutes to 30 minutes, would there be enough current capacity to produce 20,000 units of each type of swing set?
Why do waiting lines form at a service facility even though there may be more than enough service capacity to meet normal demand in the long run?
Chapter 5 Solutions
Practical Operations Management
Ch. 5 - Prob. 1DQCh. 5 - Prob. 2DQCh. 5 - Prob. 3DQCh. 5 - Prob. 4DQCh. 5 - Prob. 5DQCh. 5 - Prob. 6DQCh. 5 - Prob. 7DQCh. 5 - Prob. 1PCh. 5 - Prob. 2PCh. 5 - Prob. 3P
Ch. 5 - Prob. 4PCh. 5 - Prob. 5PCh. 5 - Prob. 6PCh. 5 - Prob. 7PCh. 5 - Prob. 8PCh. 5 - Prob. 9PCh. 5 - Prob. 10PCh. 5 - Prob. 11PCh. 5 - Prob. 12PCh. 5 - Prob. 13PCh. 5 - Prob. 14PCh. 5 - Prob. 15PCh. 5 - Prob. 16PCh. 5 - Prob. 17PCh. 5 - Prob. 18PCh. 5 - Prob. 19PCh. 5 - Prob. 20PCh. 5 - Prob. 21PCh. 5 - Prob. 22PCh. 5 - Prob. 23PCh. 5 - Prob. 24PCh. 5 - Prob. 25PCh. 5 - Prob. 26PCh. 5 - Prob. 27PCh. 5 - Prob. 28PCh. 5 - Prob. 29PCh. 5 - Prob. 30PCh. 5 - Prob. 31PCh. 5 - Prob. 32PCh. 5 - Prob. 33PCh. 5 - Prob. 34PCh. 5 - Prob. 35PCh. 5 - Prob. 36PCh. 5 - Prob. 37PCh. 5 - Prob. 38PCh. 5 - Prob. 1.1QCh. 5 - Prob. 1.2QCh. 5 - Prob. 1.3QCh. 5 - Prob. 1.4QCh. 5 - Prob. 2.1QCh. 5 - Prob. 2.2QCh. 5 - Prob. 2.3QCh. 5 - Prob. 3.1QCh. 5 - Prob. 3.2QCh. 5 - Prob. 3.3QCh. 5 - Prob. 3.4Q
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- A and C mall is a busy centre for residents in East Legon and its surrounding community. Assume that 2 customers arrive every 12 minutes and 3 customers are served every 15 minutes and that currently, there is only one cashier. a) Determine the average waiting time in minutes before service begins. (b) Calculate the financial gain to A and C mall under option 1 and advice management on the option. (c) Calculate the financial gain to A and C mall under option 2, assuming the initial capital outlay is sunk cost and advice management on this option.arrow_forward11. Leo manages a receiving station for rice. Farmers deliver their loads of rice from 7 am to 7 pm. Leo can process them at a rate of 4.5 tons an hour, and on a heavy day, a total of 96 tons can be expected. The station has room to hold only 15 tons of rice in inventory prior to processing. Once this space is filled, the farmers’ trucks must wait to dump their contents. What is the throughput (flow) rate after 7 pm (in tons/hr)?arrow_forwardThe Corner Cleaners 24-hour laundromat has 16 washing machines. A machine breaks down every 20 days(exponentially distributed). The repair service the laundromat contracts takes an average of one day to repair amachine (exponentially distributed). A washing machineaverages $5 per hour in revenue. The laundromat is considering a new repair service that guarantees repairs in0.50 day, but they charge $10 more per hour than thecurrent repair service. Should the laundromat switch tothe new repair service?arrow_forward
- I ONLY NEED HELP WITH PARTS B,C,D PLEASE The Robotics Manufacturing Company operates an equipment repair business where emergency jobs arrive randomly at the rate of three jobs per 8-hour day. The company's repair facility is a single-server system operated by a repair technician. The service time varies, with a mean repair time of 2.2 hours and a standard deviation of 1.4 hours. The company's cost of the repair operation is $27 per hour. In the economic analysis of the waiting line system, Robotics uses $36 per hour cost for customers waiting during the repair process. (a) What are the arrival rate and service rate in jobs per hour? (Round your answers to four decimal places.) ?= 0.375 IS CORRECT ?= 0.4545 IS CORRECT (b) Show the operating characteristics. (Round your answers to four decimal places. Report time in hours.) Lq= 1.4622 IS WRONG L= Wq= h W= h Show the total cost per hour. (Express the total cost per hour in dollars. Round your answer to the nearest cent.) TC = $…arrow_forwardIn a lightbulb manufacturing system, on average 1 lightbulb arrives every 0.5 hours. The average processing time of the system is 20 minutes for each lightbulb. There are two processing units. What is the probability that both processing units are idle? (percentage)arrow_forwardCindy Jo's Hair Salon is concerned about its rising costs of supplies, energy, and labor, so it is considering investing in better equipment, which hopefully will reduce the time required to perform most hairstyles as well as result in better perceived quality by its customers. It predicts that the added investment will increase output levels as well as reduce energy costs, since some of the new equipment (hair dryers) use less electricity. Inputs and Outputs Current (this year) Expected (next year) Hairstyles per week 290 340 Labor costs per week $970 $1,020 Energy costs per week $390 $350 Material costs per week $340 $365 Capital investment $0 $15,000 Using the given information, determine the current and expected single-factor and total productivity measures. Do not round intermediate calculations. Round your answers to three decimal places. Productivity Current (this year) Expected (next year) Labor haircuts/dollar haircuts/dollar…arrow_forward
- In which circumstances is queuing useful?arrow_forwardThe Corner Cleaners 24-hour laundromat has 16 washing machines., A machine breaks down every 20 days (exponentially distributed). The repair service the laundromat contracts takes anaverage of one day to repair a machine (exponentially distributed). A washing machine averages $5 per hour in revenue. The laundromat is considering a new repair service that guarantees repairs in 0.50 day, but they charge $10 more per hour than the current repair service. Currently, how long does the laundromat have to wait for its equipment to be repaired? days, (Round your answer to 2 decimal places, the tolerance is +/- 0.05.) What is the cost of equipment downtime? | (Round your answer to 2 decimal places, the tolerance is +2.5) %24arrow_forwardRideShare offers short-term rentals of vehicles that are kept in small lots in urbanneighborhoods with plenty of potential customers. With one lot, it has eight cars. Theinterarrival time of potential demand for this lot from its base of customers is 40 minutes.The average rental period is five hours. If a customer checks availability of vehicles in thislot online and finds that they are all rented for the desired time, the customer skips rentingand finds alternative arrangements. However, because customers pay a monthly fee tosubscribe to this service, RideShare does not want customers to be disappointed too often.a. What is the offered load?b. What is the implied utilization?c. What is the capacity of the process (rentals per hour)?d. What is the probability that all eight cars are rented at the same time?e. How many customers are served every hour?f. What is the utilization of the cars?g. How many cars should it have in this lot to ensure that it serves at least 90 percent ofdemand?arrow_forward
- United Raiders Drive-In Market has one checkout counter where one employee operates the cash register. The combination of the cash resister and the operator is the server in this queuing system; the customers who line up at the counter to pay their selections form the waiting line. Customers arrive at a rate of 24 per hour according to a Poisson distribution, and service times are on average equal to 2 minutes per customer. What is the number of customers waiting in the queue on average?arrow_forwardGive reason that why do waiting lines form even though a service system is underloaded .arrow_forwardCakes baked by the Freshfood Bakery are transported fromthe ovens to be packaged by one of three wrappers. Eachwrapper can wrap an average of 120 cakes per hour (Poissondistributed). The cakes are brought to the wrappers at therate of 300 per hour (Poisson distributed). If a cake sitslonger than 5 minutes before being wrapped, it will not befresh enough to meet the bakery’s quality control standards.Does the bakery need to hire another wrapper?arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,