Practical Operations Management
2nd Edition
ISBN: 9781939297136
Author: Simpson
Publisher: HERCHER PUBLISHING,INCORPORATED
expand_more
expand_more
format_list_bulleted
Concept explainers
Question
Chapter 5, Problem 27P
Summary Introduction
Interpretation: Number of carpets machine B needs to clean more than machine A to achieve break-even.
Concept introduction: The break-even is the point at which total revenue and cost are the same. There is not any gain or loss.
Expert Solution & Answer
Want to see the full answer?
Check out a sample textbook solutionStudents have asked these similar questions
A crew of mechanics at the Department of Transportation garage make minor repairs to snowplows during the winter. The snowplows break down at an average rate of 4 vehicles per day and breakdowns are distributed according to the Poisson distribution. The mechanic can service an average of 10 vehicles per day with a repair time distribution that approximates a negative exponential distribution. Assume an 8 hour day.
What is the system utilization?
Group of answer choices
0.60
0.17
0.40
0.67
A large food-processing corporation is considering using laser technology to speed up and eliminate waste in the potato-peeling process. To implement the system, the company anticipates needing $3 million to purchase the industrial-strength lasers. The system will save $1,200,000 per year in labor and materials. However, it will incur an additional operating and maintenance cost of $250,000 per year. Annual income taxes will also increase by $150,000. The system is expected to have a 10-year service life and a salvage value of about $200,000. If the company's MARR is 18%,justify the economics of the project using the PW method.
The common measures of a queuing system's performance include:
O probability that the service facility will be idle, average queue length, and probability
that the waiting time will exceed a specified duration.
average time each customer spends in the system, probability that the service
system will be idle, and average time each customer spends in the queue.
average queue length, maximum time a customer may spend in the queue, and the
utilization factor for the system.
average time each customer spends in the system, maximum queue length, and
probability of a specific number of customers in the system.
maximum queue length, maximum time a customer may spend in the queue, and
average queue length.
Chapter 5 Solutions
Practical Operations Management
Ch. 5 - Prob. 1DQCh. 5 - Prob. 2DQCh. 5 - Prob. 3DQCh. 5 - Prob. 4DQCh. 5 - Prob. 5DQCh. 5 - Prob. 6DQCh. 5 - Prob. 7DQCh. 5 - Prob. 1PCh. 5 - Prob. 2PCh. 5 - Prob. 3P
Ch. 5 - Prob. 4PCh. 5 - Prob. 5PCh. 5 - Prob. 6PCh. 5 - Prob. 7PCh. 5 - Prob. 8PCh. 5 - Prob. 9PCh. 5 - Prob. 10PCh. 5 - Prob. 11PCh. 5 - Prob. 12PCh. 5 - Prob. 13PCh. 5 - Prob. 14PCh. 5 - Prob. 15PCh. 5 - Prob. 16PCh. 5 - Prob. 17PCh. 5 - Prob. 18PCh. 5 - Prob. 19PCh. 5 - Prob. 20PCh. 5 - Prob. 21PCh. 5 - Prob. 22PCh. 5 - Prob. 23PCh. 5 - Prob. 24PCh. 5 - Prob. 25PCh. 5 - Prob. 26PCh. 5 - Prob. 27PCh. 5 - Prob. 28PCh. 5 - Prob. 29PCh. 5 - Prob. 30PCh. 5 - Prob. 31PCh. 5 - Prob. 32PCh. 5 - Prob. 33PCh. 5 - Prob. 34PCh. 5 - Prob. 35PCh. 5 - Prob. 36PCh. 5 - Prob. 37PCh. 5 - Prob. 38PCh. 5 - Prob. 1.1QCh. 5 - Prob. 1.2QCh. 5 - Prob. 1.3QCh. 5 - Prob. 1.4QCh. 5 - Prob. 2.1QCh. 5 - Prob. 2.2QCh. 5 - Prob. 2.3QCh. 5 - Prob. 3.1QCh. 5 - Prob. 3.2QCh. 5 - Prob. 3.3QCh. 5 - Prob. 3.4Q
Knowledge Booster
Learn more about
Need a deep-dive on the concept behind this application? Look no further. Learn more about this topic, operations-management and related others by exploring similar questions and additional content below.Similar questions
- At the beginning of each week, a machine is in one of four conditions: 1 = excellent; 2 = good; 3 = average; 4 = bad. The weekly revenue earned by a machine in state 1, 2, 3, or 4 is 100, 90, 50, or 10, respectively. After observing the condition of the machine at the beginning of the week, the company has the option, for a cost of 200, of instantaneously replacing the machine with an excellent machine. The quality of the machine deteriorates over time, as shown in the file P10 41.xlsx. Four maintenance policies are under consideration: Policy 1: Never replace a machine. Policy 2: Immediately replace a bad machine. Policy 3: Immediately replace a bad or average machine. Policy 4: Immediately replace a bad, average, or good machine. Simulate each of these policies for 50 weeks (using at least 250 iterations each) to determine the policy that maximizes expected weekly profit. Assume that the machine at the beginning of week 1 is excellent.arrow_forwardA mechanic at the Department of Maintenance makes minor repairs to faulty golf electric carts. The carts break down at an average rate of 4 carts per day and breakdowns are distributed according to the Poisson distribution. The mechanic can service an average of 6 carts per day with a repair time distribution that approximates a negative exponential distribution. Assume an 8 hour day. a- What is the utilization rate for the mechanic? b- What is the average time in hours that a cart is out of service?arrow_forwardJefferson Company's demand for its only product exceeds its manufacturing capacity. The company provided the following information for the machine whose limited capacity is prohibiting the company from producing and selling additional units. 4,900 minutes 7,000 minutes 3.8 units per minute 4.0 units per minute 15,827 units 18,620 units Actual run time this week Machine time available per week Actual run rate this week Ideal run rate Defect-free output this week Total output this week (including defects) Required: 1. Compute the utilization rate. (Round your answer to 2 decimal places.) 2. Compute the efficiency rate. (Round your answer to 2 decimal places.) 3. Compute the quality rate. (Round your answer to 2 decimal places.) 4. Compute the overall equipment effectiveness (OEE). (Do not round intermediate calculations. Round your final answer to 3 decimal places.) Utilization rate Efficiency rate Quality rate Overall equipment effectivenessarrow_forward
- Failsafe Textiles employs three highly skilled maintenanceworkers who are responsible for repairing the numerous in-dustrial robots used in its manufacturing process. A workercan fix one robot every 8 hours on average, with an exponen-tial distribution. An average of one robot fails every 3 hours,according to a Poisson distribution. Each down robot coststhe company $100.00 per hour in lost production. A newmaintenance worker costs the company $80.00 per hour insalary, benefits, and equipment. Should the manager hireany new personnel? If so, how many people? What would yourecommend to the manager, based on your analysis?arrow_forwardA Printed Circuit Board (PCB) machine installs integrated circuits onto a board. Before starting to produce a board, the PCB machine requires a 16-minute setup. Once in production, the PCB machine requires only 0.19 minute per board. a. Currently, the PCB machine produces 525 boards between setups. Given this operating process, what is the capacity of the PCB machine (in boards per min)? b. Currently, the PCB machine produces 525 boards between setups. Given this operating process, what is the utilization of the PCB machine? c. Say the PCB machine produces 400 boards s between setups and demand is 2 boards per minute. Given the operating process, what is the avergae inventory of boards anf the PCB machine? d. Demand for boards occurs at the rate of 2 boards per minute. What is the smallest batch size such that the PCB machine does not constrain the flow rate through the process?arrow_forwardA department could generate an additional $520,000 in billable revenue each year if they could lower their rate of ‘no-show’ patient appointments by 12%. The average PT has an average of 6.5 visits per day, and works 210 days per year. There are 5 PT’s on staff. Their current ‘no-show’ rate is 0.8 patients per day. What is the new target for the ‘no-show’ rate?arrow_forward
- Seattle's Top Coffee owns and operates a chain of popular coffee stands that serve over 30 different coffee-based beverages. The constraint at the coffee stands is the amount of time required to fill an order, which can be considerable for the more complex beverages. Sales are often lost because customers leave after seeing a long waiting line to place an order. Careful analysis of the company's existing products has revealed that the opportunity cost of order filling time is $2.70 per minute. The company is considering introducing a new product, praline cappuccino, to be made with pecan extract and molasses. The variable cost of the standard size praline cappuccino would be $0.30 and the time required to fill an order for the beverage would be 40 seconds Required: What is the minimum acceptable selling price for the new praline cappuccino product?arrow_forwardConsider the order delivery system of Heartha Hardware and Construction Supplies:- Customers (whether by bulk or retail) would line up in a counter where sales representatives will entertain them. It would take about 15 minutes before a customer will be entertained due to the number of customers being served by the sales representative and only about 4 sales representatives are on duty every day.- The sales representative will take down the customer’s order in the order slip with corresponding prices. On some cases, she will ask the person in-charge in the warehouse if the items are available. She then forwards the order slip to the cashier.- The cashier would sum-up again manually the order slip from the sales representative to check the accuracy of the footing of the totals as well as the prices indicated. This would take about 10 minutes, depending on the bulk of the order being placed.- The official receipt will be printed and will be given to the…arrow_forwardA Company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used 7 workers, who produced an average of 87 carts per hour. Workers receive $15 per hour, and machine coast was $43 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $14 per hour while output increased by four carts per hour. a) Compute the multifactor productivity (MFP) (labor plus equipment) under the Prior to buying the new equipment. The MFP (carts/S) = Blank 1 (round to 4 decimal places). b) Compute the productivity changes between the Prior to and after buying the new equipment. The productivity growth = Blank 2% (round to 2 decimal places) Blank 1 Add your answer Blank 2 Add your answerarrow_forward
- A Company that makes shopping carts for supermarkets and other stores recently purchased some new equipment that reduces the labor content of the jobs needed to produce the shopping carts. Prior to buying the new equipment, the company used 6 workers, who produced an average of 78 carts per hour. Workers receive $10 per hour, and machine coast was $36 per hour. With the new equipment, it was possible to transfer one of the workers to another department, and equipment cost increased by $13 per hour while output increased by four carts per hour.a) Compute the multifactor productivity (MFP) (labor plus equipment) under the Prior to buying the new equipment. The MFP (carts/$) = (round to 4 decimal places).b) Compute the % growth in productivity between the Prior to and after buying the new equipment. The growth in productivity = % (round to 2 decimal places)arrow_forwardNavern Corporation manufactures and sells custom home elevators. From the time an order is placed until the time the elevator is installed in the customer's home averages 141 days. The 141 days are spent as follows: Wait time Inspection time Process time Move time Queue time What is Navern's manufacturing cycle efficiency (MCE) for its elevators? Multiple Choice O O 41.1% 30.4% 58.9% 29 days 24 days 34 days 31 days 23 days 57.4%arrow_forwardThe Corner Cleaners 24-hour laundromat has 16 washing machines., A machine breaks down every 20 days (exponentially distributed). The repair service the laundromat contracts takes anaverage of one day to repair a machine (exponentially distributed). A washing machine averages $5 per hour in revenue. The laundromat is considering a new repair service that guarantees repairs in 0.50 day, but they charge $10 more per hour than the current repair service. Currently, how long does the laundromat have to wait for its equipment to be repaired? days, (Round your answer to 2 decimal places, the tolerance is +/- 0.05.) What is the cost of equipment downtime? | (Round your answer to 2 decimal places, the tolerance is +2.5) %24arrow_forward
arrow_back_ios
SEE MORE QUESTIONS
arrow_forward_ios
Recommended textbooks for you
- Practical Management ScienceOperations ManagementISBN:9781337406659Author:WINSTON, Wayne L.Publisher:Cengage,
Practical Management Science
Operations Management
ISBN:9781337406659
Author:WINSTON, Wayne L.
Publisher:Cengage,